TP-Link TL-SG1024D, tl-sg1048, TL-SG1016D, TL-SG1008 manual Initialization

Page 22

Gigabit Unmanaged Switch

Note: The fgure is to illustrate the application and principle. The power plug you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the fgure above.

4444 Initialization

After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically to ensure the device functions properly. During this time, its LED indica- tors will respond as follows:

All of the LED indicators will flash momentarily for one second, which represents a resetting of the system.

The Power LED indicator will light up.

17 Connection

Image 22
Contents Installation Guide Page Copyright & Trademarks FCC Statement CE Mark WarningAudience Related Document About this Installation GuideConventions Contents Cccccccccc Introduction FeaturesProduct Overview Appearance Front PanelLEDs Power Socket Rear PanelPackage Contents CCCCCCCCCCInstallationSafety Precautions Temperature/Humidity Site RequirementsInstallation Tools Lightening ProtectionDesktop Installation Product InstallationRack Installation Fffffffffff Rack Installation Cabling Reasonably Cccccccccc Lightning ProtectionRequirements for Cabling Outdoors Requirements for Cabling Indoors Connecting to the Grounding Bar Connect to GroundConnecting to the Ground via the Power Supply Equipotential Bonding Use Lightning Arrester Lightning Protection CCCCCCCCCCConnection Verify InstallationPower On Ethernet PortInitialization Appendix a Troubleshooting Qqqq The Power LED is not litAppendix B Specifications FCC, CEAppendix C Technical Support Page Page Mail support@tp-link.com F106503699 Rev
Related manuals
Manual 32 pages 38.68 Kb Manual 6 pages 20.27 Kb Manual 32 pages 8.69 Kb