Installation Instructions |
CONTENTS |
|
DIMENSIONAL DRAWING | 2 |
TOOLS REQUIRED FOR INSTALLATION | 3 |
PARTS LIST | 3 |
INSPECT INSTALLATION LOCATION | 3 |
INSTALLATION | 4 |
PARTS LIST
Prior to assembly, unpack the carton completely. Verify contents listed in Table 1.
Read installation instructions completely. If you are missing any of the listed parts, contact Customer Service at:
Table 1. Parts List
TOOLS REQUIRED FOR
INSTALLATION
•Allen wrench set
NOTE: Other tools may be required depending on your method of installation.
REF |
| DESCRIPTION | QTY |
|
|
| |
10 | 1 | ||
|
|
|
|
20 | Screws |
| 4 |
|
|
|
|
30 | Spacers |
| 4 |
|
|
|
|
PL1A* | Key C346A | OR | 2 |
PL1B* | Key C346B | OR | 2 |
PL1C* | Key C346C |
| 2 |
|
|
|
|
*The
INSPECT INSTALLATION
LOCATION
Because of the wide variety of possible mounting situations, Chief Manufacturing only provides general guidelines for the typical
Study the following information carefully, and make adjustments as necessary to fit your specific installation.
WARNING
There is a potential for personal injury or equipment damage if the projector is not adequately mounted. Be aware of the overall weight of the equipment, including weight of projector and all attaching hardware.
3