Christie Digital Systems 104-017101-XX, 38-DSP104-XX Legs should fit inside the stacking mounts

Page 5

Stacking Frame Installation Instructions

3. Loosen the nuts on the rear stacking legs to provide lateral movement for easier alignment with the stacking mounts on the other projector.

For upright position: Release the rear stacking legs on the top projector.

For inverted position: Release the rear stacking legs on the bottom projector.

4. Remove the safety pins from each stacking mount in order to fit the stacking legs into the stacking mounts. Refer to Figure 3.

For upright position: Remove the pins from the mounts on the bottom projector.

For inverted position: Remove the pins from the mounts on the top projector.

5.

RELEASED

With one person positioned on each side of the projector, lift the top projector onto

 

the bottom projector, aligning all three stacking points between the projectors. The

 

legs should fit inside the stacking mounts.

6. Turn the adjusting wheel on each stacking mount until the hole in the top portion of the mount lines up with the hole in the stacking leg. To make alignment easier insert a screwdriver into one of the holes and use it to align the two holes.

 

 

 

 

Control 2006

 

 

WARNING

 

 

Step 7 is a critical safety procedure that must be observed.

 

 

Failure to engage the safety locks could cause the

 

projectors to separate, resulting in possible injury or death.

 

OFFICIALLY

 

Figure 3. Stacking Mount Components

7.

 

Document

 

8,

Insert the safety pin through the holes in

 

 

 

the stacking mounts and stacking l gs.

 

 

 

 

September

 

 

Ensure each pin is fully inserted to engage

 

 

 

the safety lock and secure the projectors.

 

 

 

Refer to Figure 3.

 

 

 

 

8. Before hoisting, firmly tighten the nuts on

 

 

 

the two rear stacking l gs. If

the

 

 

 

projectors are ready for image alignment

 

 

 

keep the nuts slightly loose until

 

 

 

alignment is complete.

 

 

 

9.

When required, repeat teps 1 to 8 for the

 

 

 

third projector.

 

 

 

 

013-100342-01 (Rev.1) (08/06)

5 of 12 pages

Image 5
Contents Introduction ReleasedAlways use all rigging points Use metric hardware only. Never force incompatible threadsOfficially Stacking Frame InstallationFor inverted stack Place the proj Stack Projectors. Always followLegs should fit inside the stacking mounts Key Points Hoisting ProcedureFour Rigging Points Hoisting via Stacking Frame HandlesHoisting via Roadster/Mirage S+/Roadster HD12K Hardware REL EAS ED Projector Alignment Directional Adjustment TiltOfficially North America Technical Support