Christie Digital Systems 104-018101-XX Hoisting via Stacking Frame Handles, Four Rigging Points

Page 7

Stacking Frame Installation Instructions

Hoisting via Stacking Frame Handles

WARNING

When hoisting via the stacking frame handles it is mandatory to use at least four rigging points (two opposite sides). Straps must be placed on either side of designated label on the stacking frame handles.

1.If the projector is inverted retract the adjustable feet to prevent the hoisting hardware from becoming snagged. RELEASED

Always use at least two safety cables when hoisting

and attach them to the two eyebolts on the stacking frame.

2.Attach a safety cable to at least of the eyebolts

mounted on the bottom of the stacking frame. 2006

3.Secure the rigging components toControlthe appropriate rigging points. Refer to the designatedOFFICIALLYlabels on the stacking frame handles8, for rigging positions.

4.It is mandatory to useSeptemberfour riggingDocumentpoints. Ensu e the straps, clamps or cabling meet the ad quate load capacity for the total projector(s) w ight. DO NOT join the rigging straps or ca les to a

common point — keep separated.

Refer to Figure 4.WARNING

Figure 4. Four Rigging Points

013-100342-01 (Rev.1) (08/06)

7 of 12 pages

Image 7
Contents Introduction ReleasedAlways use all rigging points Use metric hardware only. Never force incompatible threadsOfficially Stacking Frame InstallationFor inverted stack Place the proj Stack Projectors. Always followLegs should fit inside the stacking mounts Key Points Hoisting ProcedureFour Rigging Points Hoisting via Stacking Frame HandlesHoisting via Roadster/Mirage S+/Roadster HD12K Hardware REL EAS ED Projector Alignment Directional Adjustment TiltOfficially North America Technical Support