Barco DATA 708 installation manual Installation SET UP, Access to controls

Page 13

Installation Set Up

4

INSTALLATION SET UP

 

Access to controls

Opening procedure :

During the projector set up and installation it is neces- sary to open the top cover.

To gain access, procede as follow :

*Turn both lock screws with a screwdriver or a coin counter clockwise.

*Lift up and pivot the top cover.

*Support the top cover with the hand, no support is incorporated.

During some installations it will become handy to remove the top cover totally.

Therefore,

- pivote the top cover ± 60°

-push the top cover to the front side of the projector until it jumps out of its hings.

-Turn the top cover till 90° and lift it up.

Re-install the cover :

Hook the top cover into the cabinet hinges. Pivot the top cover 30° and pull it backwards until it fits in the hinges. Close the cover and secure the lock screws by turning clockwise with a screwdriver or coin.

5975987A BARCODATA 708 260597

 

1-1

 

Image 13
Contents Installation Manual Page Barco Projection Systems Barco nv/Projection Systems Table of Contents 5975987A Barcodata 708 On safety Safety InstructionsOn cleaning On installationOn servicing On repackingUnpacking Unpacking and DimensionsProjector dimensions mm What about ambient light ? EnvironmentWhich screen type? What image size? How big should the image be?How to install the projector? Where to install the projector?Access to controls Installation SET UPScan adaptation ConnectorsData Installation Set Up Projector Set Up Projector SET UPProjector Set Up Power mains cord connection Power ConnectionSwitching on/off FusesPower Connection Entering the adjustment mode Installation AdjustmentsInstallation Random Access Service Adjustment GuidedInstallation mode start up Overview flow chart installation modeEnter Blue lens Green lens Red lens Scheimpfug adjustmentElectrical focusing Optical lens focusingElectrical focus Phosphor border Raster centeringCRT projection angle adjustment B B CC D D Alignment of the projector Installation Adjustments G2 adjustment G2 AdjustmentGreen G2 LED Material Safety Data Sheet Treshold Limit Value