Peerless Industries EXA-S, EXC-S, EXB-S Installation to Wood Joist Ceilings or Wood Stud Walls

Page 5

Installation to Wood Joist Ceilings or Wood Stud Walls

WARNING

Installer must verify that the supporting surface will safely support the combined load of the equipment and all attached hardware and components.

Tighten wood screws so that ceiling/wall plate is firmly attached, but do not overtighten. Overtightening can damage the screws, greatly reducing their holding power.

Never tighten in excess of 80 in. • lb (9 N.M.).

Make sure that mounting screws are anchored into the center of the stud or joist. The use of an "edge to edge" stud finder is highly recommended.

Hardware provided is for attachment of mount through standard thickness drywall or plaster into wood studs or joists. Installers are responsible to provide hardware for other types of mounting situations (not UL approved).

2 NOTE: Wall installation with models EXC, EXC-S and EXC-W is not available.

Use a stud finder to locate the edges of the stud or joist. Use of an edge-to-edge stud finder is highly recommended. Based on its edges, draw a vertical line down the stud's or joist’s center. Place ceiling/wall plate (A) on wall or ceiling as a template, making sure that the two mounting slots are on the centerline.

For ceiling installation: Opening on outer channel (B) indicates front of mount. Use the correct mounting slots on the ceiling/wall plate depending on ceiling joist orientation as shown in figure 2.1 and figure 2.2. Mounting slots on ceiling plate allow for 45° (±22.5) of rotation before securing to joist.

For wall installation: Opening on outer channel (B) indicates top of mount.

Mark the center of the two mounting holes. Drill two 5/32" (4 mm) dia. holes 2-1/2" (65 mm) deep. Secure ceiling/wall plate (A) to wood stud or joist using two #14 x 2-1/2" wood screws (H) and two flat washers (O) as shown.

Skip to step 3

 

CEILING INSTALLATION

 

WALL INSTALLATION

 

 

WOOD

 

 

(EXCEPT FOR EXC MODELS)

 

 

 

 

 

 

 

 

JOIST

 

 

 

 

 

fig. 2.1

 

fig. 2.2

 

 

WOOD

 

 

 

 

 

 

 

 

 

 

 

STUD

 

 

 

 

 

fig. 2.3

 

 

 

 

 

OPENING ON OUTER

 

 

 

 

A

CHANNEL(B) INDICATES

 

 

A

 

TOP OF MOUNT

 

 

 

 

 

 

 

 

B

MOUNTING

O

 

 

 

 

SLOTS ALLOW

 

 

 

 

O

FOR ROTATION

H

 

 

 

 

BEFORE

 

 

 

 

SECURING TO

 

 

A

 

H

JOIST

 

 

 

 

 

 

 

 

 

 

B

B

 

O

 

 

 

H

 

 

OPENING ON OUTER CHANNEL (B)

 

 

 

 

 

 

 

 

 

INDICATES FRONT OF MOUNT

 

 

 

 

 

 

5 of 11

 

ISSUED: 1-11-08 SHEET #: 055-9495-2

10-16-08

Visit the Peerless Web Site at www.peerlessmounts.com

For customer care call 1-800-865-2112 or 708-865-8870.

Image 5
Contents Features Installation and Assembly Projector Ceiling/Wall MountTable of Contents Tools Needed for AssemblyParts List Part List Install Outer Channel to Ceiling PlateCeiling Installation Wall Installation Installation to Wood Joist Ceilings or Wood Stud WallsWall Installation InstallationCeiling Incorrect CorrectCeiling Installation Installing Inner Channel and Routing CablesCeiling Installation Installing Projector MountMount for installing projector Installing ProjectorCeiling Installation Wall Installation Adjusting Mount ExtensionInstall Cable Covers Projector Alignment Swivel Adjustment with PRG Swivel Adjustment with PRS