32-Port 10/100Mbps Ethernet Switch User Guide
Unpacking
Open the shipping cartons of the Switch and carefully unpacks its contents. The carton should contain the following items:
•One the
•One AC power cord
•Four rubber feet to be used for shock cushioning
•Screws and two mounting brackets
•This User Guide
If any item is found missing or damaged, contact your local reseller for replacement.
Installation
The site where you install the hub stack may greatly affect its performance. When installing, consider the following pointers:
•Install the Switch in a cool and dry place. See Specifications for the acceptable temperature and humidity operating ranges.
•Install the Switch in a site free from strong electromagnetic field generators (such as motors), vibration, dust, and direct exposure to sunlight.
•Leave at least 10 cm of space at the front and rear of the hub for ventilation.
•Install the Switch on a sturdy, level surface that can support its weight, or in an EIA
12 | AirLink+ |