Agilent Technologies U2751A manual Getting Started

Page 32

1 Getting Started

5Select Install the software automatically (Recommended) and click Next.

6A warning message will appear on the Hardware Installation window. Click Continue Anyway to proceed with the installation of the U2751A.

16

U2751A User’s and Service Guide

Image 32
Contents User’s and Service Guide U T I O N WA R N I N G Safety Symbols CATInstrument and accessories. The cables or wires should be Any other volatile liquid to clean the deviceFrom occurring Device protection may be impairedEnvironmental Conditions U T I O NRegulatory Markings For more information Product CategoryAffixed product label is as shown below This Guide… Getting StartedU2751A User’s and Service Guide Declaration of Conformity DoC T EContents Chassis Installation U2922A pin configuration Pin backplane connector pin configurationList of Figures Panel view of the Agilent Measurement ManagerXIV Part number and description of replaceable part Electrical and mechanical specifications update perList of Tables XVI Installation U2751A DSub ConnectorChassis Installation IntroductionIntroduction Bumpers Product at a GlanceProduct Outlook Power inlet USB indicator Power indicator DSub connectorPin backplane connector USB inlet Product Dimensions Dimensions Without Bumpers105.00 mm 175.00 mm 25.00 mm41.00 mm Dimensions With Bumpers117.00 mm 180.00 mm Standard Purchase Items Inspection and Maintenance General MaintenanceInitial Inspection Electrical CheckWith Agilent VEE Pro, LabVIEW, or Microsoft Visual Studio Installation and ConfigurationInstallation Check Your System Hard-disk space 1 GBInstall the IO Libraries Suite Install the Module Driver Install the Agilent Measurement Manager T E Connect the Module to Your PC ProceedingGetting Started Select Ignore to disable the warning message Go to Start Control Panel and double-clickSystemGetting Started T E Send Commands To This Instrument Verify Your Module ConnectionIO Control will launch automatically when you start your PC Launch Your Agilent Measurement ManagerAgilent Measurement Manager help file U2751A DSub Connector 1Pin assignments2U2922A pin configuration U2922A Terminal BlockFemale DSub connector Terminal block Retractable cover 3U2922A outlook85.00 mm 23.00 mm 90.00 mm 105.00 mm85.00 mm 105.00 mm 23.00 mmCables U2922A Terminal Block InstallationPrior to attaching the U2922A to the U2751A Housing Jack screws of the U2922APin Backplane Connector Pin Configuration DescriptionChassis Installation Power Up Switch Control Scpi Commands for System-Related TasksPower Up Switch Control 1Switch matrix conceptAgilent Measurement Manager Operation Scpi Commands Relay Cycle Counter 3Panel view of the relay cycle counterSelf-Test Error ConditionsSystem-Related Operation Scpi Commands for System-Related Tasks Example 4, Performing system-related tasksCharacteristics and Specifications Product Characteristics Operating EnvironmentProduct Specifications General characteristics Service Information Checking Defective Relays Row ColumnReplaceable Parts 2Part number and description of replaceable partDisassembly Instructions DIAGnosticRELayCYCLesCLEar @chlist Reassembly Instructions Contacting Agilent TechnologiesIndex Index Contact us