D-Link ethernet managed switch manual Table of Contents

Page 4

 

Table of Contents

Intended Readers

v

Typographical Conventions

v

Notes, Notices, and Cautions

v

Safety Instructions

vi

Safety Cautions

vi

General Precautions for Rack-Mountable Products

vii

Lithium Battery Precaution

viii

Protecting Against Electrostatic Discharge

viii

Introduction

1

Switch Description

1

Ports

2

Front-Panel Components

3

LED Indicators

4

Rear Panel Description

6

Side Panel Description

7

Installation

8

Package Contents

8

Installation Guidelines

8

Installing the Switch without the Rack

9

Installing the Switch in a Rack

9

Mounting the Switch in a Standard 19" Rack

10

Power On

10

Power Failure

10

Installing the SFP Ports

11

The Optional Module

12

Installing the Module

13

External Redundant Power System

14

Connecting the Switch

16

Switch to End Node

16

Switch to Switch

16

Connecting To Network Backbone or Server

17

Introduction to Switch Management

18

Management Options

18

Connecting the Console Port (RS-232 DCE)

19

Managing the Switch for the First Time

20

Password Protection

21

SNMP Settings

22

Traps

22

MIBs

22

IP Address Assignment

22

Web-based Switch Configuration

25

Introduction

25

Logging in to the Web Manager

26

Web-based User Interface

27

Areas of the User Interface

27

Web Pages

28

Technical Specifications

29

Cables and Connectors

31

 

iii

Image 4
Contents Hardware Installation Guide Page Vcci Warning Table of Contents Page Command Intended ReadersTypographical Conventions Convention DescriptionSafety Instructions Safety CautionsGeneral Precautions for Rack-Mountable Products Page Introduction Switch DescriptionSection Ports DGS-3426 DGS-3426P DGS-3427 DGS-3450Front-Panel Components Front Panel View of the DGS-3426 DGS-3426PLED Indicators LED Indicators on DGS-3450Description Power ConsolePort LEDs 10GE PortsRear Panel Description Rear panel view of the DGS-3426 DGS-3426PSide Panel Description 13 Side Panel view of the DGS-3450Package Contents InstallationInstallation Guidelines Installing the Switch without the Rack Installing the Switch in a RackPower On Mounting the Switch in a Standard 19 RackPower Failure Installing the SFP Ports Inserting the fiber-optic transceivers into the DGS-3426Optional Module Front Panel of the DEM-410XInstalling the Module Inserting the optional module into the Switch DGS-3450External Redundant Power System DGS-3450 with the DPS-500 chassis RPSPage Switch to End Node Connecting the SwitchSwitch to Switch Connecting To Network Backbone or Server Introduction to Switch Management Management OptionsConnecting the Console Port RS-232 DCE To connect a terminal to the console portManaging the Switch for the First Time Initial Screen after first connectionPassword Protection Creating an Account on the SwitchSnmp Settings IP Address AssignmentTraps MIBsShow switch command Assigning the Switch an IP Address Web-based Switch Configuration IntroductionEnter Network Password window Logging in to the Web ManagerArea Web-based User InterfaceArea Function Web Pages Technical Specifications Appendix aPhysical and Environmental Internal Power Supply Operating TemperatureStorage Temperature DimensionsAppendix B Cables and ConnectorsRJ-45 Pin Assignments Appendix C Cable LengthsStandard Media Type Maximum Distance Glossary Page Page Page Product Registration Tech Support Technical SupportTechnical Support Technische Ondersteuning Pomoc techniczna Teknistä tukea asiakkaille Suomessa Suport tehnic Australia Link Middle East Dubai, U.A.E IndiaEgypt Singapore, Thailand, Indonesia, MalaysiaBahrain Россия Грузия LietuvaУкраина EestiSoporte Técnico Suporte Técnico Link友訊科技 台灣分公司 技術支援資訊 Dukungan Teknis ディーリンクジャパン Web サイト 技术支持 Registration Card All Countries and Regions Excluding USA