
Chapter 2: Installation
3.Verify that the shipping container includes the
Two equipment brackets (for wall or rack installation)
Eight bracket screws (for wall or rack installation)
Four wall anchors (for wall mount installation)
Four screws and washers (for wall mount installation)
Four rubber feet (for desktop installation)
One regional AC power cord
One SFP slot dust cover
Four screws (for rack mount installation)
Figure 4. AT-GS900/8PS Switch Items
36