
Chapter 2: Installation
Powering On the Switch
To power on the switch, perform the following procedure:
1.Plug the power cord into the AC power connector on the back of the switch, as shown in Figure 13.
Figure 13. Plugging in the AC Power Cord
2. Plug the other end of the power cord into a wall outlet.
Warning: Power cord is used as a disconnection device. To de- energize equipment, disconnect the power cord. E3
Pluggable Equipment. The socket outlet shall be installed near the equipment and shall be easily accessible. E5
3.Verify that the POWER LED is green. If the LED is OFF, refer to Chapter 3, “Troubleshooting” on page 47.
The switch is now powered on and ready for network operations.
46