Allied Telesis AT-GS900/16 manual

Page 39

AT-GS900/16, AT-GS900/24 Gigabit eco-friendly Ethernet Switch Installation Guide

10.Power ON the end-nodes connected to the switch.

11.Check that all the L/A LEDs are green or blinking green for the ports connected to end-nodes. If any of the LEDs are OFF, refer to “Troubleshooting” on page 41 for instructions.

The switch is now ready for use.

39

Image 39
Contents Installation Guide Copyright 2010 Allied Telesis, Inc Electrical Safety and Emissions Standards Translated Safety Statements Contents Contents Figures Figures Tables List of Tables Preface Symbol Meaning Description Safety Symbols Used in this DocumentWhere to Find Web-based Guides Contacting Allied Telesis Management Software UpdatesPage Chapter Product DescriptionFeatures AT-GS900/16 ComponentsTwisted Pair Ports Hardware Feature DescriptionMaximum Distance Action Results Eco-friendly SwitchState Description AC Power ConnectorMAC Address Table Duplex Mode Ethernet Switching BasicsStore Forward Page Installation Reviewing Safety Precautions Installation Selecting a Site for the Switch Speed Type of Cable Maximum Planning the InstallationUnpacking the Switch Installing the Switch on a Table or Desktop 100 Attaching the brackets to the sides of the switch Installing the Switch on a Wall1925 Installation Attaching Rack Mounting Brackets Installing the Switch in a Rack1921 Page Installation Troubleshooting Power Specifications Technical SpecificationsPhysical Specifications Environmental SpecificationsCompliance Standards Safety and Electromagnetic Emissions CertificationsPin Signal RJ-45 Twisted Pair Port ConnectorsPin Pair Signal