8CHAPTER 1: UNPACKING INSTRUCTIONS
Unpacking a Chassis
Your chassis will have the following preinstalled components:
■One power supply
■Two fan trays
■Either of the following:
■A Switch Fabric Management Module
OR
■A Switch Fabric Management Module plus a specified set of interface modules. This configuration may be labeled as a starter kit on your sales paperwork.
To unpack your Switch 4005 chassis, follow these steps:
1Before you continue to unpack the shipping box or install the product, carefully examine the box for signs of external damage. If the shipping box shows any signs of damage, replace any items that you have already removed, reseal the shipping box, and contact your network supplier (the company from which you purchased the product) immediately.
If you cannot contact your supplier, contact 3Com Customer Service:
■If you are located in the United States or Canada, call
■If you are located in another country, find the appropriate telephone
number from the 3Com Web site:
http://www.3com.com/util/enterprise.html
2If there is no or superficial external damage, use a sufficient number of people to move the heavy shipping box. Place it near the rack, table, or shelf where you plan to install the chassis.
WARNING: To minimize the risk of personal injury or equipment damage, have at least two people transport the shipping box.
WARNING: Safety regulations require that the rack, table, or shelf must be able to support at least three times the weight of a fully loaded chassis. A fully loaded Switch 4005 chassis weighs approximately 20.6 kg (45.5 lb) fully loaded. Therefore, the selected rack, table, or shelf must support at least 61.8 kg (136.5 lb).