RTS KGATX0101400 technical manual Voltage Checks, ‹ 3.2.2 Close to Emergency Source Side

Page 8

Section 3 — Operation

RTS “W” Type Transfer Switch

‹3.2.2 CLOSE TO EMERGENCY SOURCE SIDE

Before proceeding, verify the position of the switch by observing window “B” in Figure 3.1. If window “B” reads “ON”, the contacts are closed in the EMERGENCY (STANDBY) position. No further action is required. If it reads “OFF”, proceed with Step 1.

Step 1: With the handle attached to the actuating shaft, move the handle in the direction of the arrow on the switch cover until it stops - DO NOT FORCE. Release handle slowly to allow the spring in the switch box to relax. “OFF” now appears in Window “A” and “ON” appears in Window “B”.

‹3.2.3 RETURN TO NORMAL SOURCE SIDE

Manually actuate switch to return Window “A” to the “ON” position.

3.3VOLTAGE CHECKS

‹3.3.1 UTILITY VOLTAGE CHECKS

1.Turn ON the UTILITY power supply to the trans- fer switch with whatever means provided (such as the UTILITY maim line circuit breaker).

DANGER

PROCEED WITH CAUTION. THE TRANSFER SWITCH IS NOW ELECTRICALLY HOT. CONTACT WITH LIVE TERMINALS RESULTS IN EXTREMELY HAZARDOUS AND POSSIBLY FATAL ELECTRICAL SHOCK.

2.With an accurate AC voltmeter, check for correct voltage.

Single-phase utility supply:

Measure across ATS terminal lugs N1 and N2; N1 to NEUTRAL and N2 to NEUTRAL.

DANGER

FAILURE TO TURN OFF THE UTILITY SUPPLY BEFORE WORKING ON THE UTILITY CONNEC- TIONS OF THE ATS WILL RESULT IN EXTREMELY DANGEROUS AND POSSIBLY FATAL ELECTRICAL SHOCK.

5.When certain that UTILITY supply voltage is cor- rect and compatible with transfer switch ratings, turn OFF the UTILITY supply to the transfer switch.

‹3.3.2 GENERATOR VOLTAGE CHECKS

1.On the generator panel, set the AUTO/OFF/ MANUAL switch to MANUAL position. The gen- erator should crank and start.

2.Let the generator stabilize and warm up at no- load for at least five minutes.

3.Set the generator's main circuit breaker (CB1) to its ON or CLOSED position.

DANGER

PROCEED WITH CAUTION. GENERATOR OUTPUT VOLTAGE IS NOW BEING DELIVERED TO TRANSFER SWITCH TERMINALS. CONTACT WITH LIVE TERMINALS RESULTS IN EXTREMELY DANGEROUS AND POSSIBLY FATAL ELECTRICAL SHOCK.

4.With an accurate AC voltmeter and frequency meter, check the no-load, voltage and frequency. Single-phase generator supply:

Measure across ATS terminal lugs E1 to E2; E1 to NEUTRAL and E2 to NEUTRAL.

a.Frequency ....................................... 60-62 Hz

b.Terminals E1 to E2 ........................ 240-246 VAC

c.Terminals E1 to NEUTRAL............. 120-123 VAC

d.Terminals E2 to NEUTRAL............. 120-123 VAC

5.When certain that UTILITY supply voltage is cor- rect and compatible with transfer switch ratings, turn OFF the UTILITY supply to the transfer switch.

6.Set the generator’s main circuit breaker (CB1) to its OFF or OPEN position.

7.Set the AUTO/OFF/MANUAL switch to the OFF position to shut down the generator.

NOTE:

Do NOT proceed until generator AC output volt- age and frequency are correct and within stated limits. If the no-load voltage is correct but no- load frequency is incorrect, the engine governed speed probably requires adjustment. If no-load frequency is correct but voltage is not, the voltage regulator may require adjustment.

6

Image 8
Contents Technical Manual  General Hazards  Back Cover Transfer Switch Data Label Transfer Switch EnclosureSafe USE of Transfer Switch IntroductionIntroduction to Installation Connecting Power Source and Load LinesUnpacking MountingAuxiliary Contacts Connecting Start Circuit WiresFunctional Tests Adjustments Manual Operation ‹ 3.2.1 Close to Normal Source SideVoltage Checks ‹ 3.2.2 Close to Emergency Source SideGenerator Tests Under Load Installation Diagram Electrical Data GTS GTS Exploded Views and Parts List QTY Description Carrier WARRANTY/SERVICE