INSTALLING THE SWITCH
The EZSwitch 10/100 can be placed on a desktop or shelf, or installed in a standard
Equipment Checklist
After unpacking the EZSwitch 10/100, check the contents of the box to be sure you have received the following components:
.EZSwitch 10/100 SMC108DT
.Appropriate AC power cable
.Four rubber feet
.SMC Warranty Registration Card
.This User Guide
Immediately inform your dealer in the event of any incorrect, missing or damaged parts. If possible, please retain the carton and original packing materials in case there is a need to return the product.
Please fill out and return the warranty registration card to SMC or reg- ister on SMC’s Web Site at: www.smc.com. The EZ Switch 10/100 is cov- ered by a limited lifetime warranty.
Selecting a Site
Be sure to follow the site selection guidelines below when choosing a location:
. Select a suitable location for the switch:
.It should be accessible for installing, cabling and maintaining the switch.
.The temperature and humidity should be within the ranges l isted in the specifications.
.The status LEDs should be clearly visible.
.There should be adequate space (approximately two inches) on all sides for proper airflow.
.Make sure
.Make sure that a properly grounded power outlet is within 2.44 meters (8 feet) of the switch and is powered from an independent circuit breaker. As with any equipment, using a fil ter or surge suppressor is recommended.