INSTALLING THE SWITCH
•Protection from radio frequency interference emissions
•Electrical surge suppression
•Separation of electrical wires (switch related or other) and electromagnetic fields from data based network wiring
•Safe connections with no damaged cables, connectors or shields
Figure 3-3 RJ-45 Connections
Equipment Checklist
After unpacking the switch, check the contents to be sure you have received all the components. If any of the items are missing or damaged, contact your local distributor. Also, be sure you have all the necessary tools and cabling before installing the switch.
Package Contents
•TigerAccess EE Switch (SMC7816M/VSW)
•Four adhesive foot pads
•Bracket Mounting Kit containing two brackets and four screws for attaching the brackets to the switch
•Power
•Two
•This Installation Guide
•Management Guide CD