SMC Networks 10G manual Power and Cooling Problems, Installation

Page 60

TROUBLESHOOTING

 

Table A-1 Troubleshooting Chart

 

 

 

Symptom

 

Action

 

 

 

Stack Link LED is

 

• The uplink/downlink has failed.

Flashing Green/Amber

 

• Check that the stacking cables are connected properly.

 

 

 

 

Replace the cable if necessary.

 

 

• Power cycle the switch to try and clear the condition.

 

 

 

Link LED is Off

 

• Verify that the switch and attached device are powered

 

 

on.

 

 

• Be sure the cable is plugged into both the switch and

 

 

corresponding device.

 

 

• Verify that the proper cable type is used and its length

 

 

does not exceed specified limits.

 

 

• Check the adapter on the attached device and cable

 

 

connections for possible defects. Replace the defective

 

 

adapter or cable if necessary.

 

 

 

Power and Cooling Problems

If the power indicator does not turn on when the power cord is plugged in, you may have a problem with the power outlet, power cord, or internal power supply. However, if the unit powers off after running for a while, check for loose power connections, power losses or surges at the power outlet, and verify that the fans on the unit are unobstructed and running prior to shutdown. If you still cannot isolate the problem, then the internal power supply may be defective.

Installation

Verify that all system components have been properly installed. If one or more components appear to be malfunctioning (such as the power cord or network cabling), test them in an alternate environment where you are sure that all the other components are functioning properly.

A-2

Image 60
Contents TigerStack 10G Page TigerStack 10G Installation Guide Trademarks Limited Warranty SMC Networks, Inc Tesla Irvine, CA Compliances FCC Class aIndustry Canada Class a Japan Vcci Class aCE Mark Declaration of Conformance for EMI and Safety EEC Safety Compliance Taiwan Bsmi Class a Australia AS/NZS 3548 1995 Class aWarnhinweis Faseroptikanschlüsse Optische Sicherheit Power Cord Safety France and Peru onlyVii Viii Environmental Statement End of Product Life SpanManufacturing Materials DocumentationPurpose Related PublicationsTable of Contents Making Network Connections Appendices Xiv Tables Xvi Figures Xviii Chapter About Tigerstack 10G OverviewSwitch Architecture SMC8748M and SMC8724M Front PanelsDescription of Hardware Management Options10/100/1000BASE-T Ports SFP Slots Stacking PortsStatus LEDs Port LEDs Port Status LEDsSystem Status LEDs System Status LEDs Features and Benefits Optional Redundant Power UnitPower Supply Receptacles ConnectivityExpandability PerformanceManagement About the Tigerstack 10G Introduction to Switching Chapter Network PlanningApplication Examples Collapsed BackboneNetwork Aggregation Plan Network Aggregation PlanRemote Connections with Fiber Cable Remote Connection with Fiber CableMaking Vlan Connections Making Vlan ConnectionsApplication Notes Installing the Switch Selecting a SiteEthernet Cabling RJ-45 ConnectionsEquipment Checklist Package ContentsOptional Rack-Mounting Equipment Mounting Rack MountingAttaching the Brackets Desktop or Shelf Mounting Attaching the Adhesive FeetInstalling an Optional SFP Transceiver into the Switch Inserting an SFP Transceiver into a SlotConnecting Switches in a Stack Making Stacking ConnectionsStacking Topologies Connecting to a Power Source Power ReceptacleConnecting to the Console Port Serial Port DB-9 DTE Pin-OutInstalling the Switch Connecting Network Devices Chapter Making Network ConnectionsTwisted-Pair Devices Cabling GuidelinesConnecting to PCs, Servers, Hubs and Switches Making Twisted-Pair ConnectionsNetwork Wiring Connections Wiring Closet ConnectionsFiber Optic SFP Devices Making LC Port Connections Connectivity Rules 1000BASE-T Cable RequirementsMbps Gigabit Ethernet Collision Length Maximum 1000BASE-T Gigabit Ethernet Cable LengthMbps Fast Ethernet Collision Domain Mbps Ethernet Collision DomainCable Labeling and Connection Records Appendix a Troubleshooting Diagnosing Switch IndicatorsTable A-1 Troubleshooting Chart Power and Cooling Problems InstallationIn-Band Access Stack TroubleshootingTroubleshooting Appendix B Cables Twisted-Pair Cable and Pin AssignmentsStraight-Through Wiring 10BASE-T/100BASE-TX Pin AssignmentsTable B-1 10/100BASE-TX MDI and MDI-X Port Pinouts Crossover Wiring Figure B-2 Straight-through Wiring1000BASE-T Pin Assignments Table B-2 1000BASE-T MDI-X and MDI Port PinoutsCable Testing for Existing Category 5 Cable Adjusting Existing Category 5 Cabling to Run 1000BASE-TFiber Standards Appendix C Specifications Physical CharacteristicsWeight TemperaturePower Supply Power ConsumptionSwitch Features Management FeaturesStandards Warranty SafetyCompliances CE Mark EmissionsAppendix D Ordering Information Ordering Information Glossary 1000BASE-TAuto-Negotiation Bandwidth CollisionCollision Domain End StationGigabit Ethernet Full DuplexIeee Ieee 802.3abMedia Access Control MAC Redundant Power Unit RPURJ-45 Connector Switched PortsTransmission Control Protocol/Internet Protocol TCP/IP Virtual LAN VlanGlossary-6 Index NumericsIndex-2 Index-3 Index-4 Page For Technical SUPPORT, Call