Tyco Step Install the 9800 FlexFit plug, 3A. Prepare the cable, 3B. Insert the cable

Page 7

Step 3.

Install the 9800 FlexFit plug.

Reset button

 

 

 

 

 

 

Test button

 

 

 

K

 

Cover

 

 

 

eep

d

 

 

 

 

 

 

ry

 

Ground-fault

Ga

rder

TE

 

 

unit

 

a

ST

 

 

 

 

 

 

 

 

 

u

s

 

 

 

 

 

ec

 

 

 

 

 

 

 

 

Cable guide

 

 

 

 

Indicator

Back wall

 

 

 

 

light

 

 

 

 

 

 

 

 

 

 

 

Indicator post

 

 

 

 

 

 

Ground contact

ENGLISH

3A. Prepare the cable.

3/4"

(2 cm)

Cleanly cut off the end of the cable. Push back the braid 3/4" (2 cm) and then twist the end of the braid around the cable to ensure the braid strands are not sticking up.

Note: The clear plastic wrap does not need to be removed.

3B. Insert the cable.

Back wall

Insert the heating cable all the way into the cable guide until the cable hits the back wall.

Be sure no braid wire strands enter cable guide.

3C. Complete the connection.

Indicator

post

Screw down the cable guide, alternating between the two screws, until the cable guide is flush with the indicator posts and the screws bottom out.

3D. Install the cover.

Install the cover by tightening the screws completely.

Note: The screws will require many turns before the cover starts to close.

0

3/4

in

012

cm

5

Image 7
Contents Keep pipes from freezing Protection anti-gel des tuyaux Avant de débuter ContentsTable des matières Before You BeginImportants Five Important Safety WarningsType of pipe plastic or metal Length and diameter of pipe General Instructions1C. Calculate the total length of heating cable required Plastic Pipe Number of heating cable runs requiredExample Step Install the end seal 3A. Prepare the cable Step Install the 9800 FlexFit plug3D. Install the cover Install the cover by tightening the screws completelyMultiple run method 4A. Prepare to install the heating cable4B. Install the heating cable Single run method Step Attach the heating cable to the pipeStep Start up the system Step Install the insulationStep Test the system Periodically Problem The signal light does not light upPeriodic Inspections Each monthLimited Warranty