Step 3.
Install the 9800 FlexFit plug.
Reset button |
|
|
|
|
|
|
Test button |
|
|
| K |
| Cover |
|
|
| eep | d |
| |
|
|
|
|
| ry |
|
Ga | rder | TE |
|
| ||
unit |
| a | ST |
|
| |
|
|
|
|
| ||
|
| u | s |
|
| |
|
|
| ec |
|
| |
|
|
|
|
|
| Cable guide |
|
|
|
| Indicator | Back wall | |
|
|
|
| light | ||
|
|
|
|
| ||
|
|
|
|
|
| Indicator post |
|
|
|
|
|
| Ground contact |
ENGLISH
3A. Prepare the cable.
3/4" |
(2 cm) |
Cleanly cut off the end of the cable. Push back the braid 3/4" (2 cm) and then twist the end of the braid around the cable to ensure the braid strands are not sticking up.
Note: The clear plastic wrap does not need to be removed.
3B. Insert the cable.
Back wall |
Insert the heating cable all the way into the cable guide until the cable hits the back wall.
Be sure no braid wire strands enter cable guide.
3C. Complete the connection.
Indicator |
post |
Screw down the cable guide, alternating between the two screws, until the cable guide is flush with the indicator posts and the screws bottom out.
3D. Install the cover.
Install the cover by tightening the screws completely.
Note: The screws will require many turns before the cover starts to close.
0 | 3/4 |
in
012
cm
5