Tyco 9800 installation instructions Step Install the end seal

Page 6

ENGLISH

Step 2.

Install the end seal.

Note: The end seal can only be used once, so do not install it until step 2D.

Heating Cable Construction

Clear plastic

Black core

wrap

(bus wires inside)

Braid

Blue jacket

2A. Prepare the heating cable.

2B. Push the braid back.

Cleanly cut off one end of the heating cable.

2C. Remove the plastic wrap.

1"

(25 mm)

Push the braid back 1" (25 mm) from heating cable end.

2D. Install the end seal.

1" (25 mm)

Cut and remove the clear plastic wrap. Do not cut into the blue jacket.

2E. Secure the braid.

Firmly push the end seal at least 3/4" (2 cm) onto the heating cable. Some gel may ooze out.

Slide the braid up against the end seal and wrap it securely with a 4" (10 cm) strip of glass fiber or vinyl tape.

4

in

mm

0

0

10

1

20

Image 6
Contents Keep pipes from freezing Protection anti-gel des tuyaux Before You Begin ContentsTable des matières Avant de débuterFive Important Safety Warnings ImportantsGeneral Instructions Type of pipe plastic or metal Length and diameter of pipePlastic Pipe Number of heating cable runs required 1C. Calculate the total length of heating cable requiredExample Step Install the end seal Install the cover by tightening the screws completely Step Install the 9800 FlexFit plug3D. Install the cover 3A. Prepare the cableStep Attach the heating cable to the pipe 4A. Prepare to install the heating cable4B. Install the heating cable Single run method Multiple run methodStep Install the insulation Step Start up the systemStep Test the system Each month Problem The signal light does not light upPeriodic Inspections PeriodicallyLimited Warranty