NetComm NP3005 manual Preparation before connecting your switch

Page 13

Preparation before connecting your switch

Before you install your switch, make sure you will be operating the unit within the specified voltage and temperature limits. To install your switch on a flat surface, simply adhere the included rubber feet within the outlines on the bottom surface of the unit. Ensure the switch is positioned with at least 50mm of space on all sides for adequate ventilation.

To install the switch on a wall, measure the distance between the mounting holes on the back of the switch and mark the wall to match the measured distance. At the marked location, screw into the wall two suitably sized screws.

Choose a location that is near the devices to be connected, is close to a suitable electrical outlet, and provides at least 50mm of space all around the switch for ventilation.

Rev.1 - YML671

www.netcomm.com.au

NP3005 - 5 Port Gigabit Switch

Page 13

Image 13
Contents Page Contents Introduction Gigabit Ethernet Technology Features Package Contents Front Panel LED IndicatorsRear Panel Twisted pair cables RJ-45 Network portsStraight and crossover cable configuration Application examples Basic Desktop Network SwitchConnecting One NP3005 to another existing network switch Cascading the switchPreparation before connecting your switch Connecting power to the switch Attaching computers to the switchVerifying installation CSMA/CD NB3005 SpecificationsContact Information Registering your NetComm ProductTick Mark declaration of conformance Trademarks and NoticesWarranty Registration Form Page Limitations of Warranty Product Warranty