LevelOne IFE-0502, IFE-0501 user manual Mounting Installation, DIN-Rail Mounting

Page 14

Mounting Installation

DIN-Rail Mounting

The DIN-Rail is screwed on the industrial switch when out of factory. If the DIN-Rail is not screwed on the industrial switch, please see the following pictures to screw the DIN-Rail on the switch. Follow the steps below to hang the industrial switch.

1.Use the screws to screw the DIN-Rail on the rear side of the industrial switch.

2.To remove the DIN-Rail, reverse the step 1.

3.After the DIN-Rail is screwed on the rear side of the switch, insert the top of DIN-Rail into the track.

14

Image 14
Contents LevelOne FCC Warning Content Features IntroductionPackage Contents Front Panel Physical DimensionHardware Description Top View LED Indicators Color DescriptionPin Number Assignment Pin MDI-X Signal Name MDI Signal NamePorts Page Cabling Wiring the Power Inputs Wiring the Fault Alarm Contact Mounting Installation DIN-Rail MountingPage Wall Mount Plate Mounting Hardware Installation Installation StepsNetwork Application Troubleshooting Technical Specification Consumption Installation Power SupplyPower Temperature Case Dimension