Wiring

To wire the module, do the following:

1.Remove AC panel power and disconnect the backup battery.

CAUTION: To prevent damaging the panel or module, you must remove panel AC power and disconnect the backup battery before making or changing wiring connections.

2.Wire the module to the panel bus and to the battery termi- nals for power (Figure 5).

Note: The module can also be powered off the SuperBus 2000 two amp power supply (600-1019), but should not be powered directly off the panel.

Case tamper switch installation

If the module is easily accessible, you can add case tamper detec- tion to activate an alarm or trouble (depending on panel program- ming) when the cover is removed.

To install the tamper switch, see Figure 6 and do the following:

1.Slide the reed switch into the plastic holder on the module backplate.

Figure 6. Case tamper switch installation

Module

Module

backplate

cover

Figure 5. Wiring connections

Concord control panel

-+

24V GND +12V A B

Black Green

White

 

 

Red

Black

GSM Module

+

-

 

 

12V battery

+12V A B GND

 

 

Red

10 amp fuse

 

 

3.You can connect an input device to the module Z1 and ZCOM terminals if required.

Magnet

Magnet clip

Reed switch

2.0Kohm EOL resistor (01-022)

2.Connect a UL Listed reed switch (with 2 Kohm EOL resistor 01-022) to the module zone input or to any unused hardwired input on the panel.

3.Insert the magnet into the nibs on the top cover and press the magnet clip down over the magnet until it clicks into place into the cover.

Image 3
Contents Introduction GSM status LEDsFunction Module location guidelines InstallationInstallation guidelines Tools and supplies neededCase tamper switch installation WiringYellow LED Power upStatus LEDs Red LEDGSM status LEDs Module states modesSensors 94, 95, Step Three System Location Step Two Create Customers LoginAccount creation Step One Customer InformationCompare All Plans Step Five Choose a Service PlanStep Four Panel Information ConcordAccount Creation Successful Troubleshooting/testingSpecifications FCC compliance