3 Unpacking and Installation
This chapter provides unpacking and installation information for the Switch.
3.1Unpacking
Open the box and carefully unpacks its contents. The box should contain the following items:
•One freeConnect Smart G2400
•One AC power cord, suitable for your area’s electrical power connections
•Four rubber feet to be used for shock cushioning
•Screws and two mounting brackets
•
If any item is found missing or damaged, please contact your local reseller for replacement.
3.2Installation
The site where you install the hub stack may greatly affect its performance. When installing the unit, consider the following pointers:
•Install the Switch in a fairly cool and dry place. See Technical Specifications for the acceptable temperature and humidity operating ranges.
•Install the Switch in a site free from strong electromagnetic field generators (such as motors), vibration, dust, and direct exposure to sunlight.
•Leave at least 4” (10cm) of space at the front and rear of the Switch for ventilation.
•Install the Switch on a sturdy, level surface that can support its weight, or in an EIA
•When installing the Switch on a level surface, attach the rubber feet to the bottom of each device (Figure 1). The rubber feet cushion the Switch and protect the case and surface from scratching.
Figure 1: Attach the feet to the Switch
3.3Rack Mounting
The Switch can be mounted in an EIA