Freedom9 G2400 user manual Unpacking and Installation, Rack Mounting

Page 7

3 Unpacking and Installation

This chapter provides unpacking and installation information for the Switch.

3.1Unpacking

Open the box and carefully unpacks its contents. The box should contain the following items:

One freeConnect Smart G2400

One AC power cord, suitable for your area’s electrical power connections

Four rubber feet to be used for shock cushioning

Screws and two mounting brackets

CD-ROM with Web Management Utility and User’s Guide

If any item is found missing or damaged, please contact your local reseller for replacement.

3.2Installation

The site where you install the hub stack may greatly affect its performance. When installing the unit, consider the following pointers:

Install the Switch in a fairly cool and dry place. See Technical Specifications for the acceptable temperature and humidity operating ranges.

Install the Switch in a site free from strong electromagnetic field generators (such as motors), vibration, dust, and direct exposure to sunlight.

Leave at least 4” (10cm) of space at the front and rear of the Switch for ventilation.

Install the Switch on a sturdy, level surface that can support its weight, or in an EIA standard-size equipment rack. For information on rack installation, see the next section, Rack Mounting.

When installing the Switch on a level surface, attach the rubber feet to the bottom of each device (Figure 1). The rubber feet cushion the Switch and protect the case and surface from scratching.

Figure 1: Attach the feet to the Switch

3.3Rack Mounting

The Switch can be mounted in an EIA standard-size, 19-inch rack, which can be placed in a wiring closet with other equipment. Attach the mounting brackets to the switch’s front panel (one on each side), and secure them with the screws provided (Figure 2).

Image 7
Contents S112410000 Rev FreeConnect Smart G2400Copyright and Trademark Information Table of Contents Purpose About This GuideTerms/Usage Vlan Virtual Local Area Network IntroductionGigabit Ethernet Technology Fast Ethernet TechnologyFeatures Rack Mounting Unpacking and InstallationInstallation UnpackingAC Power Connecting Network CableFront Panel Identifying External ComponentsRear Panel Power and System LEDs Understanding LED IndicatorsPorts 1~24 Status LEDs Column Heading Definitions ConfigurationInstalling the Web Management Utility Discovery ListSystem word definitions in the Monitor List Monitor ListTrap Information Device SettingToolbar Configuring the SwitchEntering the IP Address LoginDevice Status Port Settings Configuring Setup SettingMain Menu QoS Quality of Service Speed/DisableFlow Control Trunk Setting Vlan Settings Virtual Local Area NetworkMaintenance Settings Mirror SettingDevice Status Restore SettingStatistics StatisticsDetailed Port Statistics System SettingSystem Setting Trap SettingBackup Setting Set PasswordReset Setting Logout Reset SettingGeneral Technical SpecificationsPerformance CE Certificate Certifications