Uplink Connections

7Turn your power source(s) on. The PWR (power) LED on both the interface module and management module faceplates will illuminate solid green to indicate the modules are receiving power.

 

 

Power LED

 

 

 

MULTIPLEXER UPLINK MODULE

FAN PWR

Lnk Act Dplx

ADSL2+ INVERSE MULTIPLEXER

PWR

RX TX LK 1 2

Management

 

Interface

05-17837

 

 

 

Module

 

Module

 

Uplink Connections

No configuration is necessary for Uplink Interface Modules (UIMs) or Media Interface Modules (MIMs) installed on the management module in your 4000E to operate at default settings. However, if you wish to run your uplink connections at settings other than the UIM or MIM defaults, configure the UIM or MIM prior to making a connection.

For further connection and configuration information, refer to the installation instructions of your particular UIM or MIM model.

Uplink Module

MULTIPLEXER UPLINK MODULE FAN PWR

Lnk

Act

Dplx

ADSL2+ INVERSE MULTIPLEXER

PWR

RX TX LK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

MUM

 

4000E

 

 

IP

 

 

DSL Access Multiplexer

 

U1

 

 

4

 

 

3

A

 

 

C

 

 

C

 

 

E

 

 

S

 

2

S

TIM

1

 

05-17838

Subscriber Lines

No configuration is necessary for the interface module(s) installed in your 4000E to operate at default settings. However, if you wish to run your subscriber connections at settings other than the factory defaults, configure the interface module(s) prior to connection. Refer to the installation instructions for your particular interface module(s).

The 4000E chassis supports ADSL, IDSL, SDSL and T1/E1 technologies. Ensure that the subscriber lines you are connecting correspond with the technology of the interface module(s) installed in your 4000E.

IPD4-A2-ZZ40-20

4000E IP Broadband Loop Carrier Installation Instructions

13

Image 13
Contents Contents End User License Agreement Zhone and Affiliates End User License Agreement Zhone and Affiliates Introduction Unpacking and Inspecting the Equipment Handling Precautions for STATIC-SENSITIVE DevicesInstallation on a Tabletop Installation OptionsInstallation in a Rack Installing a Management Module Installing Your Management ModuleInstalling Your Interface Modules Installing Your Interface Modules Do not operate the 4000E without a ground connection Powering Up Your 4000E BLCPowering Up Your 4000E BLC 48V Subscriber Lines Uplink ConnectionsInterface Module a Interface Module B Connectors Subscriber Lines Configuration and Management Securing the Connecting CablesFan Module Fan ModuleEMC SpecificationsImportant Safety Instructions United States EMI NoticesCanada CE Marking Product Documentation OnlineService Requirements Contacting Global Service and SupportTechnical Support