Asante Technologies II user manual Stacking Hubs, Stacking Cables

Page 22

SHBBook Page 10 Wednesday, March 3, 1999 8:03 PM

Installation

Stacking Hubs

Up to eight NetStacker II hubs may be connected within a stack. Furthermore, a management module can be installed easily in any of the stacked hubs, so that all of them can be managed. The management module communicates with a manager console by means of SNMP agent software, installed in the managed hub. This reduces considerably the expense of equipping each hub for management.

It is not necessary to configure a Hub ID for each NetStacker II hub in a stack. The auto-configure feature takes care of this for you.

1 Check the 50-pin “stacking” cable that was included in the package with your NetStacker II hub. It is designed specifically for stacking your unit with others of the same design.

Note: Do not use any cable but the NetStacker II stack- ing cable supplied with your unit; if you need additional cables, contact Asanté support.

2 Place the hubs in a stack so the rear panels are aligned as shown in Figure 2-10.

3 Connect the “Stack Connection Out” on the upper hub with the “Stack Connection In” of the hub below it. Leave the “Stack Connection In” of the uppermost hub and the “Stack Connection Out” of the lowermost hub uncon- nected, as shown in Figure 2-10.

Stacking Cables

Management Module Slot

Management Module Slot

Management Module Slot

Management Module Slot

Management Module Slot

Management Module Slot

Management Module Slot

Management Module Slot

Stack Connection In

Stack Connection Out

Stack Connection In

Stack Connection Out

Stack Connection In

Connection Out

Stack Connection In

Stack Connection Out

Stack Connection In

Stack Connection Out

Stack Connection In

Stack Connection Out

Stack Connection In

Stack Connection Out

Stack Connection In

Stack Connection Out

 

On

100–240Vac

Off

 

On

100–240Vac

Off

 

On

100–240Vac

Off

 

On

100–240Vac

Off

 

On

100–240Vac

Off

 

On

100–240Vac

Off

 

On

100–240Vac

Off

 

On

100–240Vac

Off

Figure 2-10 Stacking NetStacker II hubs

Page 2-10

Image 22
Contents User’s Manual Copyright Notice Trademarks Table of Contents SHBBook Page ii Wednesday, March 3, 1999 803 PM Chapter Contents About This ManualImportant Safety Instructions Document ConventionsAbout This Manual SHBBook Page vi Wednesday, March 3, 1999 803 PM Introduction Package ContentsNetStacker II Hubs Introduction Performance Features Both models accept optional slide-in fiber optic moduleSHBBook Page 4 Wednesday, March 3, 1999 803 PM Components InstallationFront Panels of the 12 Port and 24 Port Hubs LED Indicators Rear Panels of the 12 Port and 24 Port Hubs Rear panels of the 12 port and 24 port hubs both displayCabling Requirements Cabling and Voltage RequirementsVoltage Requirements Desktop Mounting Placement and MountingHub Location Rack MountingConnecting Network Devices Connecting Workstations or ServersConnecting to Another Hub Connecting cable to a NICInstallation Connecting Cable Uplink Button Straight through cable Stacking Hubs Stacking CablesAdding Fiber Optic Connectivity via MII 11 MII Module Slot on rear panelPowering on the Hub LED Indicators 12 port hub LEDsPower LED Collision Indicator LEDs10Mbps Link Activity LEDs Port Link Activity Indicator LEDsHub ID Number LEDs 100Mbps Link Activity LEDsSHBBook Page 4 Wednesday, March 3, 1999 803 PM Troubleshooting Problem Indication ActionA-2 Specifications NetStacker II Hub SpecificationsB-2 Technical Support Contacting Technical SupportSHBBook Page 2 Wednesday, March 3, 1999 803 PM SHBBook Page 1 Wednesday, March 3, 1999 803 PM Asanté TECHNOLOGIES, INC., 821 FOX LANE, SAN JOSE, CA