Field Controls SK-1 manual Installation

Page 3
INSTALLATION
Figure 2

INSTALLATION

1. Before installation, apply two beads of high temperature silicone sealant or equivalent around the bottom of the storm collar and 1 inch above the end of the Starkap™ body. (See Figure 2)

2. Insert the Starkap™ into the inside of the vent termination pipe, making sure the Starkap™ is seated against the storm collar. Fasten the Starkap™ to the vent termination pipe by

using three (3) sheet metal screws. Placement of the screws

should be approximately 1/2 inch from the end of the vent termination pipe. (See Figure 3) The heads of the screws should be covered with high temperature.

Figure 3

Page 3

Image 3
Contents Page STARKAP CHIMNEY CAPEnglish EspanõlINSTALLATION REQUIREMENTS ROOF PITCHH FEET INSTALLATION SPECIAL VENTING APPLICATION INSTALLATION SHEET PENTE DE TOIT EXIGENCES D’INSTALLATIONSTARKAP Tableau1. Avant l’installation, appliquer deux cordons de scellant de silicone à haute température ou l’équivalent autour de la partie inférieure de la mitre et à 1 po au-dessus de l’extrémité du Starkap. Voir Le Schéma FEUILLE D’INSTALLATION POUR ÉVENT SPÉCIAL INCINACIÓN DEL TEJADO StarKapREQUISITOS PARA LA INSTALACIÓN TablaFigura Figura INSTALACIÓNPage Page PN 46263300 Rev C 09/00