Quick Installation Guide
1420 Wireless Gateway
STEP 4: MOUNT AND CONNECT THE 1420
Integral Antenna with the 1420 on a Mast
The optimal installation of the 1420 Wireless Gateway is on a pole approximately 1.8 meters above the top of the exterior wall of a building. The following hardware and tools are needed:
•Pipe mount with holes spaced 3.06 inches (78 mm) apart horizontally and 11.15 inches (283 mm) apart vertically.
•Two 3.06 inch (78 mm) by 5/16 inch
•1/2 inch wrench
Mount the gateway by doing the following:
1.Insert one
2.Using a 1/2 inch
BEST PRACTICE
When mounting outside, best practice is to run the Serial or primary Ethernet cable (P1) directly to the Information System. Use conduit and/or strain relief as necessary.
BEST PRACTICE
When installing cable/conduit, run an ethernet connection from 1420 port P2 to a convenient location indoors (if the 1420 was ordered with Output Code 2). This will simplify future configuration changes.
1.8 m (6 ft.) |
Strain |
Relief |
10