Precor 719e owner manual Base

Page 7

Diagram 4

Place frame on base

Upright support

(Long tube)

Base column support

(Short tube)

Base

Base cross tube

5.Place Frame on Base. (Diagram 4) Place the base on blocks (large books will do) so you can access the underside of the base. Ask for assistance to lift and place the upper frame on the base, positioned so that the stair arms rest on the base cross tube.

Diagram 5

Attach frame to base.

Washer

Bolt pad

Base bolt

Base

6.Attach Frame to Base. (Diagram 5) Place a medium-sized, black

washer (K) on each of the base bolts (J). Align the bolt pad with the base frame holes and insert the base bolts through the bolt pad and into the base. Attach the four locknuts (A) to the ends of the bolts. Firmly tighten the base locknuts. Hold each bolt with the hex key (M) while tightening the nut with the box wrench (I).

page 7

Image 7
Contents Independent Action Climber Safety Information Table of Contents Unpacking the 719e Independent Action Climber C D E F G Assembling the 719e Independent Action Climber Base Frame Diagram Understanding the Electronic Console Using the 719e Independent Action ClimberDisplays Keypad Setting the Resistance LevelPhoto Working Out on the 719e ClimberPage General Aerobic Training Information Heart Rate Training Zone How Often Should I Exercise? How Long Should I Exercise?Cleaning the 719e Climber Maintenance and TroubleshootingChanging the Batteries Problem Solution Troubleshooting TipsGetting Service Page 33914-102 5/93