National
LM95235
manual
Software Installation and Operation
Specs
Install
1.1Block Diagram
signals to any of the
Page 10
Page 9
Page 11
Image 10
Page 9
Page 11
Contents
LM95235 Evaluation Board User’s Guide
LM95235 Evaluation Board User’s Guide
Table of Contents
LM95235 Evaluation Board User’s Guide References
1.1Block Diagram
1.0 Introduction
2.0 Quick Start
6. The Screen should look like this
Copyright 2006 National Semiconductor Corporation
Important! NO EXTERNAL POWER SUPPLY OR SIGNAL INPUTS ARE REQUIRED
2.1 Quick Start Diagram
National Semiconductor
Description
Connector Label
3.0 Functional Description
Number
4.2 Operation
4.0 Software Installation and Operation
4.1 Installation
5.1 Electrical Specifications Power Requirements
5.2 Electrical Schematic
5.0 Electrical and Mechanical Specifications
NO EXTERNAL POWER SUPPLY INPUTS ARE REQUIRED
Figure 5.3 Layout diagram of the LM95235 Evaluation Board
5.3 Evaluation Board Layout
Note socket and socket area not stuffed
Part
5.4 Bill of Materials for LM95235 Evaluation Board
Reference
PCB Footprint
5.4.2 Evaluation Board Basic Dimensions
5.4 Mechanical Specifications
5.4.1 Operating Mechanical and Environmental Specifications
5.4.3 Electrostatic Discharge ESD Precautions
LIFE SUPPORT POLICY
BANNED SUBSTANCE COMPLIANCE
Related pages
All Install page
Venting Installation Instructions for Desa (V)KC36NE
To reinstall the lower spray arm for Thermador DW44ZB
To Install Mower See Figs for Husqvarna 2748 GLS (CA)
Installation of the Modem for Multi-Tech Systems MT9234ZPX-UPCI-NV
Adapter’s hardware installation is now complete for Linksys USBVPN1 Series
Installing the Projector in Proper Position for Sanyo PLC-XD2600
Floor Base and Ductwork Installation Downflow for Johnson Controls TG8S*MP
Instructions de montage 2 INSTALLATION for GE AE1RD10AM
Test the installation for 3M G4000
How often is the
3051S manual
updated for accuracy?
Top
Page
Image
Contents