National LM95235 manual Quick Start Diagram, National Semiconductor

Page 8
2.1 Quick Start Diagram

2.1 Quick Start Diagram

Important! NO EXTERNAL POWER SUPPLY OR SIGNAL INPUTS ARE REQUIRED!

USB Cable to

Computer

Computer

with

SensorEval

software

loaded

 

N/C

 

TCRIT#

 

N/C

 

OS/A0

 

SCL

LM95235

SDA

+3.3

 

JP2

National Semiconductor

 

LM95235 Evaluation Board Rev. 1

 

© Copyright 2006 National Semiconductor Corporation

8

www.national.com

Image 8
Contents LM95235 Evaluation Board User’s Guide LM95235 Evaluation Board User’s GuideTable of Contents LM95235 Evaluation Board User’s Guide References 1.1Block Diagram 1.0 Introduction2.0 Quick Start 6. The Screen should look like this Copyright 2006 National Semiconductor Corporation National Semiconductor 2.1 Quick Start DiagramImportant! NO EXTERNAL POWER SUPPLY OR SIGNAL INPUTS ARE REQUIRED Connector Label 3.0 Functional DescriptionDescription Number4.1 Installation 4.0 Software Installation and Operation4.2 Operation 5.2 Electrical Schematic 5.0 Electrical and Mechanical Specifications5.1 Electrical Specifications Power Requirements NO EXTERNAL POWER SUPPLY INPUTS ARE REQUIREDNote socket and socket area not stuffed 5.3 Evaluation Board LayoutFigure 5.3 Layout diagram of the LM95235 Evaluation Board 5.4 Bill of Materials for LM95235 Evaluation Board ReferencePart PCB Footprint5.4 Mechanical Specifications 5.4.1 Operating Mechanical and Environmental Specifications5.4.2 Evaluation Board Basic Dimensions 5.4.3 Electrostatic Discharge ESD PrecautionsLIFE SUPPORT POLICY BANNED SUBSTANCE COMPLIANCE