Nortel Networks 2500 Seriess manual Information quality

Page 19

.

19

Information quality

Nortel technical documents are tested by subject matter experts (SMEs) throughout the product development lifecycle. SMEs from Design, Product Verification (PV), Product Line Management (PLM), Verification Office (VO), and Global Network Product Support (GNPS), all contribute to document quality.

Nortel releases technical documents in the early stages of development that have not completed all testing milestones, on a limited basis. Documents that have not completed testing bear a Draft watermark on every page to indicate that the content they contain may change as the product is refined and document testing is completed. Draft documents are not widely available.

Nortel Ethernet Routing Switch 2500 Series

Documentation Roadmap

NN47215-103 01.01

27 October 2008

Copyright © 2008 Nortel Networks

Image 19
Contents Documentation Roadmap Legal Notice Contents Customer service Nortel Networks Inc. software license agreement Software licenseGeneral Nortel Networks Inc. software license agreement Software license New in this release FeaturesOther changes New in this release Navigation IntroductionIntroduction Customer documentation packaging RoadmapDocument title Description Product FundamentalsInstallation and Commissioning Operations Upgrades and PatchesAdministration and Security Documentation file formats Fault and Performance ManagementInformation quality Information quality Angle brackets Text conventionsBold or Bold Courier text Italic text BracesBrackets EllipsesCr convention Vertical barText conventions Task-based documentation Modular, task-based informationTask flow overview How to use task-based documentationPurpose statements Work flows, task flows, and proceduresTask-based documentation terms Procedure stepsUpdated versions of documentation How to get help Customer serviceExpress Routing Codes For information about Contact Additional informationPage Documentation Roadmap