American Power Conversion AP9221EXPX166, AP9221X166 quick start manual

Page 9

6.Insert two mounting screws (provided with the enclosure) and secure the top bracket to the enclosure.

7.Insert two caged nuts above and below a notched hole on the vertical mounting rail where the middle and bottom brackets align with the rail.

8.Insert two mounting screws (provided with the enclosure) where the middle and bottom brackets align with the rail, and secure the brackets to the enclosure.

To complete installation of MasterSwitch VM, install the MasterSwitch VM Controller on a flat surface or in an enclosure. To mount the controller in an enclosure:

1.Remove the rubber feet from the bottom of the controller.

2.Attach the brackets (APC part numbers 870-8213 and 870-8183) to the controller using four flat-head screws (provided).

Continued on next page

5

Image 9
Contents MasterSwitch VM Additional Documentation Thank YouContents Page Preliminary Information Part Number Quantity Installing MasterSwitch VM Mounting in a NetShelter enclosure Mounting in a NetShelter enclosure Mounting the controller Installing MasterSwitch VM Hardwiring procedure Connecting MasterSwitch VM For the first unit in your configuration Quick Configuration On next Configuring TCP/IP settings Over the Network by ARP. Address Resolution Protocol To Through a Web browser Page APC Worldwide Customer Support