Install units in rack
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Secure the UPS and the XLBP in the |
|
|
|
| |||||||||
rack using the cage nuts and |
|
|
|
| |||||||||
ornamental screws included in the |
|
|
|
| |||||||||
7 holes |
|
| |||||||||||
package. |
|
| |||||||||||
Four ornamental screws and two cage |
|
|
|
| |||||||||
nuts must be used to secure each unit. |
|
|
|
| |||||||||
A cage nut must be used in the top |
|
|
|
| |||||||||
7 holes |
|
| |||||||||||
hole of each |
|
| |||||||||||
|
|
|
| ||||||||||
securing the unit in the rack. |
|
|
|
| |||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The bottom hole of each
Install and connect battery modules, install bezels
4x
4x
Connect all eight battery modules. Failure to do so may cause equipment damage.
Replace the battery doors.
Tighten the screws to secure the battery doors.
Install a bezel on the UPS and XLBP(s). |
6 | SURT192RMXLBP2/SURT192XLBP2 6U User Manual |