American Power Conversion UPS user manual TRANSPORT, MAINTENANCE, and Troubleshooting

Page 12

4: TRANSPORT, MAINTENANCE, AND TROUBLESHOOTING

TRANSPORTING YOUR UPS

Always DISCONNECT THE BATTERY before shipping in compliance with U.S. Department of Transportation (DOT) regulations.

This requirement applies whether the UPS is shipped alone or installed in an equipment rack or system.

Follow these steps to prepare the UPS for transport.

Due to its weight, removing the UPS from a rack requires two people.

1.Shut down any equipment attached to the UPS.

2.Disconnect the UPS from the power supply.

3.If your unit is in the Tower Configuration, skip this step and continue with Step 4, below. To remove the unit from a rack, reverse the steps for installation of the UPS into the rack found in the Rack Mount Installation Sheet found in the Rail Kit.

4.Remove the front bezel. If you are using the original UPS packaging, you must pack the front bezel separate from the UPS. Reverse the step for attaching the front bezel found in the Installa- tion section of this manual.

5.Disconnect the external battery.

6.Your UPS can now be placed in its original packaging for transport.

STORAGE

STORAGE CONDITIONS:

Store the UPS in a cool, dry location, with its batteries fully charged. Disconnect any cables con- nected to the computer interface port to avoid unnecessary battery drainage.

990-1137A, 01/03

10

Image 12
Contents APC Smart-UPSRT UX Page Installation PlacementAmp Fuse Volt System Click on Configuration Click on UPS Operating Parameters Power Off OperationCold Start Load Auto Matic Self Test ManualBattery Equipment from its batteries Online Utility VoltageBypass Battery Charge Over Load Replace Battery On Battery Operation User Configurable Items Terminal Mode TRANSPORT, MAINTENANCE, and Troubleshooting Troubleshooting Service CONTACT, REGULATORY, and Warranty Information Refer to the information provided at the APC Internet siteLimited Warranty