
THIRD PARTY BATTERY SOLUTION
Batteries must be Sealed
≥20,000 A.
Ensure that the external batteries are wired prior to connecting the batteries to the UPS.
If using a
Connect the Ground and Wire the Battery System
1.Connect the ground wire (included), to the battery enclosure ground and the TVSS screw on the back of the UPS.
2.Cut off one of the connectors on the cable revealing positive and negative wires.
3.Connect the positive (red), and negative (black) wires to the positive and negative terminals on the external battery system. Ensure that the proper polarities are connected.
4.Plug the cable connector into one of the battery connector receptacles on the back of the UPS. Either receptacle may be used.
5