APC CTFLE Meter Installation, Ctflm 6009/6015 Installation, Circuit Breaker Installation

Page 6

Meter Installation

1.Use the meter cabinet as a template and mark the mounting holes in the CTFLE.

Note: Mark the holes so that the meter indicator is visible through the window in the top panel.

2.Drill the holes.

3.Mount the meter in the CTFLE.

CTFLM 6009/6015 Installation

1.Insert the CTFLM into the enclosure so that the guide pins on the CTFLM and the CTFLE engage.

2.Push the CTFLM until a light “snap” is felt as the contacts lock into place.

3.Pull lightly on the CTFLM. If properly seated the CTFLM will not easily disengage.

Note: Connecting power to the CTFLM will be done in a later step.

Circuit Breaker Installation

1.Use the circuit breaker box as a template and mark the mounting holes in the CTFLE.

2.Drill the holes.

3.Mount the meter in the CTFLE.

Circuit Breaker Box

Utility Cable

4

Meter

CTFLM

Coax Cable

Image 6
Contents BroadBand Ctfle Series Page Safety General InformationElectrical Warnings Lifting Warnings Specifications Installation and Maintenance Ctfle Enclosure InstallationUnpacking Meter Installation Ctflm 6009/6015 InstallationCircuit Breaker Installation Wiring Connect the CtflmProblem Possible Cause Solution Troubleshooting and MaintenanceTroubleshooting Power Supply Failure MaintenanceCleaning Wiring Harness ReplacementVisual Inspection Indicator Lamp Replacement Euro Block ReplacementService, Contact and Warranty Information ServiceHow to Contact APC Limited Warranty Regulatory Approval