American Power Conversion 240-320kW400V manual Until Battery capacity Test Xxx Press Data stored

Page 29

Maintenance & Testing

Action

Display shows

1.Press

2.Press or

until

Battery capacity

test :

xxx

 

3. Press

Battery capacity

test :

ON

 

4. Press

Data stored

Description

"xxx" is back-up time from last test –

if no previous test has been performed or if the test has been aborted the display will read"???"!

A battery monitor test can be performed in the same way by selecting "Battery monitor test" in the display.

However, this test will not start, unless the battery is fully charged

The next step starts up the test! To abort press

Starts the battery test.

(To interrupt a running test – perform point 1-2 and then press key

and )

5.Wait about 1 sec.

6.Wait until backup times expires and a short alarm sounds. (No alarm in battery monitor test

if battery is OK)

7.Press

8.Press

Battery operation time : xxx min.

Normal operation load power xx%

Battery capacity

test : xxx

Normal operation load power xx%

"xxx" is obtained back-up time

in minutes. (Battery capacity test only)

Exits the parameter stack

If not operated the system will automati- cally exit after 30 seconds.

CAUTION!

To avoid battery damage, allow a minimum of 16 hours of UPS operation over a 3-month period for batteries to charge to a sufficient level.

If the UPS is to be taken out of operation for an extended period, disconnect the battery in order to prevent discharging. For details, refer to Installation Guide.

990-4057

User Guide APC Silcon 240-320kW 400V UPS

29

Image 29
Contents Copyright 2001 APC Japan 240-320kW400V UPS User GuideThank You User Guide APC Silcon 240-320kW 400V UPSDisplay Unit IntroductionIntroduction Start UPS from stand-by Stop/Start UPS and Operating the External Service BypassStop UPS for stand-by Switching off the UPS Stop UPS for complete power downSystem OFF UPS start-up Start UPS from complete power downSystem start-up now completed Bypassing the Single System UPS Operating the External Service Bypass Switch single systemsStop/Start UPS and Operating the External Service Bypass System OFF Normal operation Load power 0% Bypass operation Bypassing the Parallel UPS System All UPSs Press On the keyboard until Stop/Start UPS and Operating the External Service Bypass Set input switches Q001 to position Isolating one UPS in a Parallel/Redundant System Stop/Start UPS and Operating the External Service Bypass Keyboard OperationOperation Display of Measured Values Using the Remote DisplayEconomy Mode Parameter Settings Parameter SettingsParameter Settings Programming Example Switching to Bypass OperationProgramming Keys To return to normal operation Alarms and Events Alarms and EventsDisplaying the Alarm Stack Mode CommentsAlarms Description Action Possible AlarmsAlarms and Events Correction of false alarm situations during service Rectifying Alarm MessagesParallel Operation Alarms Maintenance & Testing Maintenance & TestingBattery Monitoring Test Battery Capacity TestUntil Battery capacity Test Xxx Press Data stored APC Silcon UPS Limited Factory Warranty WarrantyWarranty How to Contact APC How to Contact APCAPC Corporate APC DenmarkHow to Contact APC