NT1 ACE User Manual
Connecting the Terminal Equipment
After successfully powering up the NT1 ACE, the POWER and ERROR indicators should be on and the READY indica- tor should be flashing. Make sure that terminal equipment (TE) is properly terminated as instructed in Setting the Option Switches on page 4. Plug the TE into one of the Local Bus connectors at the rear of the unit. A second TE may be plugged into the remaining Local Bus connector. If more than two TEs need to be connected to the NT1 ACE, addi- tional connections can be made in parallel to the S/T bus using
.TEs commonly have additional jacks wired in parallel. These may be used to connect more than two TEs as provid- ed for by the NT1 ACE. See the TE documentation for fur- ther information.
After the TE powers up, the ERROR indicator should go out. There may be some delay between plugging in the TE and the ERROR indicator going out, depending on the specific TE in use. If the ERROR indicator fails to go out, see the sec- tion Troubleshooting on page 11.
As the ERROR indicator extinguishes, the READY indicator should illuminate. The TE will now be ready to place and receive calls. There may be a slight delay between the appearance of the READY indicator and the TE’s ability to place and receive calls, depending on the specific TE in use. If the READY indicator fails to illuminate or if you are unable to place or receive calls, see the section Troubleshoot- ing on page 11.
8 | NT1 ACE User Manual |
|