Toshiba TOS-SN-1 operation manual Programming, Parameter Description Default Value New Value

Page 2

TOS-SN-1

Connect the Extended Panel to the inverter according to the procedure mentioned below.

1.Wait 10 minutes after the S11 is turned off to insure the drive is denergized. The charge lamp can be used as a secondary indicator to determine if the drive is still charged.

2.Connect the communication connectors of the extended panel to the inverter (CN1), which has the common serial option (communication) connector, with the optional cable.

3.Insure a secure connection is made between the inverter and the extended panel once the connection is made.

4.Power on the inverter after connection has been made, and the display should turn on.

Note: Before removing the cable, insure step 1 is confirmed.

Programming

 

Parameter

 

 

Description

 

Default Value

 

 

New Value

 

 

cmod

 

Command mode selection

1

1

 

 

 

Operational Panel

 

 

Operational Panel

 

 

 

 

 

 

 

 

 

 

 

fmod

 

 

Frequency setting mode selection 1

 

0

 

3

 

 

 

 

 

Built-in Potentiometer

 

 

Operational Panel

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ΓFor additional assistance, please contact Toshiba Adjustable Speed Drive Marketing Dept. at (800) 872-2192

Image 2
Contents CAB0011 CAB0013 CAB0015 IntroductionConnections and Start Up Parameter Description Default Value New Value ProgrammingNames and Functions Dimensions MountingProtection Functions SpecificationsSpecification ГON.ESafety Precautions Handling Transportation and installationOperation About disposal of the product