3Com V7122 manual

Page 30

ƒEnable the DMZ configuration on the residential router for the LAN port where the V7122 gateway is connected. This enables unknown packets to be routed to the DMZ port.

2When working with a Gatekeeper, under H.323 Parameters, set the Working with Gatekeeper field to Yes, and then enter the IP address of the primary Gatekeeper in the Gatekeeper IP Address field. When no Gatekeeper is used, the internal routing table is used to route the calls.

3Leave Enable Annex D/T.38 FAX Relay parameter at its default unless your technical requirements differ.

4Select the coder (that is, vocoder) that best suits your VoIP system requirements. The default coder is: G.723.1 30 msec. To configure the entire list of coders you want the V7122 gateway to use, see the V7122 Digital Gateway User Guide.

5Map outgoing calls to IP addresses (when Gatekeeper is not used) by completing these steps:

a)Click the arrow button next to the Tel to IP Routing Table label; the Tel to IP Routing screen opens.

Any telephone number whose destination number matches the prefix defined in the Destination Phone Prefix field and whose source number matches the prefix defined in the adjacent Source Phone Prefix field, is sent to the IP address entered in the IP Address field.

b)Click Submit; the Tel to IP Routing table is automatically updated.

c)Click Quick Setup; you are returned to the Quick Setup screen.

For more information about the Tel to IP Routing table, see the 7122 Digital Gateway User Guide.

6Enable E1/T1 B-channels by completing these steps:

a)Click the arrow button next to the Trunk Group Table label; the Trunk Group Table screen opens.

b)Select the number of the trunk you want to enable from the Trunk ID drop-down list.

c)Enter the number of B-channels you want to enable in the Channels field.

d)Enter the starting phone number in the adjacent Phone Number field (these are virtual numbers, used only to define enabled B-channels).

e)Click Submit; the Trunk Group Table is automatically updated.

f)Click Quick Setup; you are returned to the Quick Setup screen.

7Click the Reset button, and then at the prompt click OK; the V7122 gateway applies the changes and restarts. This takes approximately three minutes to complete. When the V7122 gateway has finished restarting, the Ready and LAN LEDs on the front panel are lit green.

8After the gateway is reset, configure the V7122 gateway trunk parameters. For information on configuring the trunk parameters, see Configuring the Trunk Settings.

30

V7122 Digital Gateway Installation Guide

Image 30
Contents V7122 Digital Gateway Installation Guide 3Com Corporation, 350 Campus Drive, Marlborough MA United States Government LegendContents Upgrading the V7122 Gateway How to Use This Guide About this GuideDocumentation Comments ConventionsModel Numbers for the V7122 Gateways Icon DescriptionExample Weee EU DirectiveAbbreviations and Terminology V7122 Digital Gateway Installation Guide Quick Start V7122 Digital Gateway Installation Guide Installing the V7122 Gateway Item # Label Component DescriptionPackage Contents UnpackingInstalling the V7122 Gateway in a 19-inch Rack Mounting the V7122 GatewayMounting the V7122 Gateway on a Desktop V7122 Gateway Front View with 19-inch Rack Mount Brackets Cabling the V7122 Gateway Electrical Earthing Connecting the E1/T1 Trunk Interfaces Pin NumbersRJ-48c Connector and Pinout Installing the Ethernet ConnectionE1/T1 Number Tx Pins Tip/Ring Rx Pins Tip/Ring Connecting the Power Supply Connecting the AC Power SupplyConnecting the DC Power Supply Page V7122 Digital Gateway Installation Guide Configuring the V7122 Gateway V7122 Gateway Version Default ValueAssigning the V7122 Gateway IP Address Assigning an IP Address Using Http Assigning an IP Address Using BootP Assigning an IP Address Using the CLI Client Configuration Screen with Blank ParametersRestoring Networking Parameters to their Initial State Accessing the Embedded Web Server To access the Embedded Web Server, follow these 4 stepsConfiguring Basic H.323 Parameters V7122/H.323 Quick SetupPage Configuring Basic SIP Parameters V7122/SIP Quick SetupPage Configuring the Trunk Settings Trunks Status Color Indicator Keys Indicator Color DescriptionV7122 Digital Gateway Installation Guide V7122 Digital Gateway Installation Guide Changing the V7122 Gateway Username and Password V7122 Digital Gateway Installation Guide Restoring and Backing UP the V7122 Gateway Configuration Configuration File ScreenV7122 Digital Gateway Installation Guide Monitoring the V7122 Gateway V7122 Gateway Chassis LED IndicatorsTP-1610 Front Panel LED Indicators Monitoring the V7122 Gateway LEDsE1/T1 Trunk Status LED Indicators Label LED Color Signal DescriptionMonitoring the V7122 Gateway Trunks and B-channels Trunk & Channel Status ScreenV7122 Digital Gateway Installation Guide Software Upgrade Wizard Upgrading the V7122 GatewayStart Software Upgrade Screen V7122 Digital Gateway Installation Guide Load an ini File Screen Load a CPT File Screen End Process Screen Updating the Auxiliary Files File Type DescriptionAuxiliary Files Screen for example, SIP Gateways Regulatory Information Declaration of ConformitySafety Notices Network Information and Intent of Use Industry Canada NoticeDigital Device Warnings Network CompatibilityTelecommunication Safety Ports Safety StatusFCC Statement Appendix a Obtaining Support for Your 3COM Product Customer Support

V7122 specifications

The 3Com V7122 is a robust and versatile Layer 2/3 switch designed for small to medium-sized enterprises seeking a reliable networking solution. It plays a crucial role in improving network performance and enhancing connectivity for a growing number of devices in today’s digital landscape.

One of the standout features of the V7122 is its advanced switching capabilities. It supports 24 Ethernet ports, providing ample connectivity options for various end devices like computers, printers, and cameras. The switch offers a combination of copper and fiber interfaces, ensuring flexibility in deployment, whether for short-range or long-range connectivity.

The V7122 is equipped with a sophisticated traffic management system, which includes Quality of Service (QoS) features. This allows organizations to prioritize network traffic according to application requirements, ensuring bandwidth is allocated effectively. With this capability, time-sensitive applications such as voice-over-IP (VoIP) and video conferencing can function smoothly without interruption.

Another significant technology incorporated into the 3Com V7122 is its compatibility with VLAN (Virtual Local Area Network) configurations. This feature enables the segmentation of a network into multiple virtual networks, enhancing security and reducing congestion by limiting broadcast traffic. The ability to create subnets helps organizations to better manage their network resources and maintain optimal performance.

Moreover, the V7122 supports various network protocols, facilitating seamless integration within existing IT infrastructures. Its stackable design allows for easy scaling, enabling businesses to expand their network as needed without a complete overhaul. The switch also boasts an intuitive user interface, which simplifies management and configuration processes, making it accessible to network administrators of varying skill levels.

The 3Com V7122 stands out for its reliability and durability as well. It is built to handle the demands of an enterprise environment, featuring a compact and robust chassis designed for continuous operation. With the ability to support power over Ethernet (PoE), the switch can power connected devices directly through the Ethernet cable, eliminating the need for separate power supplies and reducing cable clutter.

In conclusion, the 3Com V7122 is a powerful networking solution that combines advanced switching features, traffic management capabilities, and flexible configurations. Its compatibility with various technologies and protocols makes it an ideal choice for organizations looking to optimize their network infrastructure for current and future demands.