3Com 3500 appendix Before You Begin, Qty Use

Page 3

Install the System

Quick Installation Guide

3

Before You Begin

3Before you install the system:

Move the system close to where you plan to install it, and close to a power receptacle.

Have a No. 2 Phillips screwdriver available.

Have the hardware kit available. See Table 2.

Table 2 System Hardware Mounting Kit

Item

Qty

Use in

 

 

 

Rubber feet (self-adhesive)

4

Installing the system on a table top

Mounting brackets

2

Installing the system in the distribution

 

 

rack

8-32 x 1/2 Phillips flat-head

8

Installing the distribution rack mounting

screws

 

brackets

10-32 x 1/2 Phillips pan-head

4

Installing the system in the distribution

screws

 

rack

 

 

 

Determine whether you are installing the system on a tabletop or in a distribution rack.

For complete installation instructions, see the chapter on “Installing the Systemin the Getting Started Guide.

WARNING: Hazardous energy exists within the system. Always be careful to avoid electric shock or equipment damage. Many installation and troubleshooting procedures should be performed only by trained technical personnel.

Image 3
Contents For the CoreBuilder 3500 System Quick Installation GuideLocation PowerQty Use Before You BeginQuick Installation Guide Install Media Modules6 Cable Processor Power Up the System Power-up Diagnostics LED Name Color DescriptionPSI or PS2 Access Mechanism Access Description Interface You define a management interface in one of two ways Defining a Management InterfaceExample Symptom Possible Sources of Problem and Steps to Take LED Status Possible Sources of Problem and Steps to Take Specifications in the Getting Started Guide Diagnostics Administer and Operate System 3Com Corporation 5400 Bayfront Plaza Santa Clara, California
Related manuals
Manual 784 pages 37.06 Kb