3Com 3500 appendix Power Up the System

Page 6

6Quick Installation Guide

Power Up the System

To get your system powered up and ready to operate:

81 Verify that each unused slot is covered with a blank faceplate.

To view possible error messages while the system is running power-up diagnostics, connect a terminal, workstation, or PC with terminal emulation software to the system’s terminal serial port. See the next section and Table 5.

2On the back panel, insert the power cord into the power receptacle. See .

CAUTION: To prevent a possible fire hazard, verify that the power cord is fully inserted.

If the spring-loaded power supply latch partially covers the power receptacle, it is because the power supply is not fully inserted and the locking pin cannot fully extend into its slot.

Figure 1 System Power Receptacle

Power Supply latch

DC OK

DC OK

!

!

Power Supply No. 2

Power Supply No. 1

3Insert the other end of the power cable into a power outlet.

4Repeat steps 2 and 3 for the second power supply if you have one.

Image 6
Contents Quick Installation Guide For the CoreBuilder 3500 SystemPower LocationBefore You Begin Qty UseQuick Installation Guide Install Media Modules6 Cable Processor Power Up the System Power-up Diagnostics LED Name Color DescriptionPSI or PS2 Access Mechanism Access Description Interface Defining a Management Interface You define a management interface in one of two waysExample Symptom Possible Sources of Problem and Steps to Take LED Status Possible Sources of Problem and Steps to Take Specifications in the Getting Started Guide Diagnostics Administer and Operate System 3Com Corporation 5400 Bayfront Plaza Santa Clara, California
Related manuals
Manual 784 pages 37.06 Kb