Premier Mounts XL6000CM installation instructions Ceiling Installation

Page 4

XL6000CM

Ceiling Installation

Upper Bridge

Ceiling Wood Stud

Ceiling

Surface

Base Box

Mounting Slot

Figure 1

Upper Bridge

1. Separate the Upper Bridge from the Base Box by removing the six (6) M6 x 12mm Phillips Head screws three on each side (Figure 1).

#14 x 2” Wood Screws

Ceiling Wood Stud

Figure 2

2.Use the appropriate slot openings for single wood stud mounting, depending on your ceiling configuration. The adjustable channel slots will allow you to fine tune the final orientation of the projector.

3.Secure the Upper Bridge to the center of the stud on

M6 X 12mm

Phillips Head

Screw

Ceiling

Surface

Base Box

the ceiling structure at this time using two (2) #14 x 2” wood screws (supplied).

Figure 3

4.Attach the Base Box to the Upper Bridge and secure with the six (6) M6 x 12mm Phillips Head screws (Figure 3). DO NOT TIGHTEN THESE SCREWS YET.

Page 4

Installation Instructions

Image 4
Contents Installation Instructions XL6000CM Projector Mount Table of Contents Installation Tools Parts ListLOCK-IT Security System Ceiling Installation Attaching the Projector Adjusting the ProjectorDo not fully loosen the screws, as the mount may drop Set screw must be used to stabilize PP-FCTA Installation1½ NPT nipple or optional pipe Technical Specifications Premier Mounts Limited Lifetime Warranty XL6000CM Projector Bracket Installation Instructions HC5000 Safety Bracket InstallationLOCK-IT Security System