Installation
ELITE SCREENS
1.Clean the location where the
2.Measure and mark the
Wall
Figure 1
3.Peel off a 1 inch length of the tape film at the top and bottom of the first taping line (fig. 2)
Figure 2
- 3 -
www.elitescreens.com
info@elitescreens.com