InFocus PRJ-WALLKIT-13 installation instructions Site Requirements

Page 5

Installation Instructions

PRJ-WALLKIT-13

 

 

Site Requirements

WARNING: IMPROPER INSTALLATION CAN LEAD TO EQUIPMENT FALLING CAUSING SERIOUS PERSONAL INJURY OR DAMAGE TO EQUIPMENT! The figure below identifies the minimum requirements for installation of mount onto a steel stud structure. If the structure or its components do not meet these requirements contact the mount manufacturer for specific instructions before attempting installation. It should also be noted that no other equipment should be mounted to the same stud.

16" (on center) Studs

Short Throw Mount Installation Location (Centered over two studs, or over

one stud)

If back side of wall is unfinished, drywall must be installed to a minimum of one stud left and right of the studs being used to install the mount. Drywall must be secured to studs using screws spaced a maximum

of 10" apart along stud.

There must be a minimum of 1-7/8" (48mm) clearance inside wall

FRONT

Drywall

**1/2" minimum Drywall Thickness

(Both Sides of Stud)

**See hazard statement on page 2!

Steel Stud (2 x 4 / 25ga minimum)

Stud type and structural strength must conform to the North American Specification for the Design of Cold-Formed Steel Structural Members. [362, 125 18, C-Shape, S - Stud Section]

Visit the InFocus support site at www.infocus.com/support

5

Image 5
Contents PRJ-WALLKIT-13 Disclaimer ดึงสายรัดใหแน่น้ Tools Required for Installation Site Requirements Concrete or Concrete Block Assembling Wall Plate to BracketsSteel Studs Wood StudsAdjusting Projector Mount Installing Short Throw Projector Arm to Bracket Leveling the Projector Arm Projector InstallationHeight Adjustment AdjustmentsPitch Adjustment Roll AdjustmentAdd Plastic Covers Cable Management OptionalPRJ-WALLKIT-13 PRJ-WALLKIT-13 PRJ-WALLKIT-13 InFocus Corporation