Motorola XPR 8300 manual Post-Installation Checklist, Applying Power, Verifying Proper Operation

Page 31

Chapter 5 Post-Installation Checklist

After the MOTOTRBO Repeater has been mechanically installed and all electrical connections have been made, power may now be applied and the repeater checked for proper operation.

5.1Applying Power

Before applying power to the repeater, make sure all boards are securely seated in the appropriate connectors on the backplane and that all RF cables are securely connected.

Turn ON the circuit breaker controlling the AC outlet that is supplying power to the repeater Power Supply Module.

5.2Verifying Proper Operation

Operation of the repeater can be verified by:

observing the state of the 8 LEDs located on the front panel, and

exercising radio operation.

!

Some repeater components can become extremely hot during operation. Turn

off all power to the repeater and wait until sufficiently cool before touching the

C a u t i o n

repeater.

 

 

5.2.1Front Panel LEDs

After turning ON the repeater power (or after a repeater reset), the 8 LEDs on the repeater front panel:

Light for about one second to indicate that they are functional, then

Go off for one second, then

Indicate the operational status of the repeater.

5.3Archiving

5.3.1Copying the Repeater Codeplug Data to a Computer

Backup the repeater's codeplug data by using the Customer Programming Software (CPS) on a computer.

Image 31
Contents 6816814H01 Page Foreword Product Safety and RF Exposure CompliancePage Declaration of Conformity Declaration of ConformityPage Table of Contents Chapter Accessories Chapter Mechanical InstallationChapter Indicators and Connectors Chapter Post-Installation ChecklistRelated Publications List of FiguresList of Figures AA M Repeater Model Numbering SchemeRepeater Model Numbering Scheme Limited Warranty Commercial WarrantyIII. State Law Rights VI. Patent and Software Provisions Xiv Operating Temperature Range Pre-Installation ConsiderationsInstallation Overview Environmental Conditions at Intended Installation SiteAir Quality AC Input Power RequirementsEquipment Ventilation Equipment Mounting MethodsLightning Ground Site Grounding and Lightning ProtectionElectrical Ground RF GroundPre-Installation Considerations Unpacking Equipment Mechanical InstallationMechanical Installation LED Indicator Descriptions Indicators and ConnectorsFront Panel Rear Panel Part Rear PanelRear Accessory Connector Pin AC Input Power Connection Power Supply ConnectionsElectrical Connections Ground Connection Battery Backup ConnectionDuplexer Selection RF Antenna ConnectionsAntenna Selection Electrical Connections Archiving Post-Installation ChecklistApplying Power Verifying Proper OperationPost-Installation Checklist Cables AccessoriesMiscellaneous Accessories AntennasAccessories Fax Orders Appendix a Replacement Parts OrderingBasic Ordering Information Motorola Online Mail Orders Telephone OrdersParts Identification Product Customer ServiceMotorola Federal Technical Center Appendix B Motorola Service CentersMotorola Service Center Servicing InformationMotorola Service Centers Page 6816814H01