2.1 OVERVIEW
This section provides a description of the evaluation module, requirements, quick installa- tion and test information. Detailed information on the M68EZ328ADS v2.0 design and oper- ation is provided in the remaining sections of this manual.
2.2 EQUIPMENTS REQUIRED
The following equipments are required to use with the M68EZ328ADS Application Develop- ment System, some of them are already bundled with the ADS package.
•Power supply −
•
•IBM PC compatible computer (486 class or higher) running Windows 3.1 and DOS 6.0 (or higher), or Windows 95, with an
2.3 INSTALLATION PROCEDURE
Please follow the procedure below to set up M68EZ328ADS.
1.Prepare the M68EZ328ADS v2.0 board
2.Connect the M68EZ328ADS v2.0 board to PC and power supply
3.Install software debugger
2.3.1 Prepare the M68EZ328ADS v2.0 board
Locate the DIP switches on the M68EZ328ADS v2.0 board and select appropriate monitor and debug port for your debugger.
Figure 2-2 shows the factory default DIP switches settings. This setting selects to use Metro- works monitor. Figure 2-3 shows the DIP switches setting of using SDS monitor.
For detail description of each switch. Pls. refer to Table 3-1 and Table 3-2.
For additional information on the M68EZ328ADS v2.0 and its components. Pls refer to Sec- tion 3 .