O v e r v i e w | 2 - 3 |
Gaskets
Each housing is equipped with a
Figure
Housing gaskets
Weather gasket (silicone rubber)
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
| JXP 1 |
|
|
|
|
|
|
|
| FWD EQ |
|
|
|
|
|
|
H |
|
|
|
| FWD EQ |
| H |
|
PORT 1 |
|
|
|
|
|
|
| PORT 2 |
L |
| ON |
|
| JXP 2 |
| L |
|
|
|
|
|
|
|
|
| |
|
| ADU |
| TCU | JXP ADU |
|
| |
|
| +24 V DC | MDR | ON |
|
|
|
|
FTEC |
| JXP 1 |
|
|
| |||
|
| OFF |
|
|
| |||
|
|
| VARILOSSER |
|
|
|
| |
|
|
| MAN | SG2- |
|
|
|
|
|
|
|
|
|
|
|
| |
|
| IS |
|
|
| IS | JXP 2 | CAUTION: |
|
| IS |
|
|
|
|
| CONTAINS PARTS |
|
|
|
|
|
|
| ANDASSEMBLIES | |
REFER TO |
|
|
|
|
|
|
| SUSCEPTIBLE TO |
| JXP 3 |
| STATUS MONITOR |
| IS | JXP 4 | DAMAGE BY | |
MANUAL FOR |
|
|
| ELECTROSTATIC | ||||
FUSE VALUES |
|
|
|
| ADU |
|
| DISCHARGE(ESD) |
|
|
|
|
|
|
|
| |
|
|
| FRB |
|
|
|
|
|
|
|
|
| ADU |
|
|
|
|
|
| JXP 3 |
| RPM/* |
|
|
| |
|
| RCVR | SG 2000 | JXP 4 |
|
|
| |
| L |
| Optical Node |
|
| L |
| |
PORT 3 |
|
|
|
| PORT 4 | |||
H |
|
|
|
|
| H | ||
| EQ |
|
| FWD EQ |
|
| ||
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
| ASSEMBLED IN MEXICO |
|
RF gasket
(woven wire)
The gaskets provide efficient ground continuity, RF shielding and weather protection. Both gaskets must be in place and in good condition to ensure proper operation and protection of the node. The silicone rubber gasket should be lightly covered with silicone grease each time the node is opened. Replace the gasket if it is damaged or deformed.
SG 2000 Installation and O peration Manual