ADC HRM-238 L1 user manual Installing Communication Wiring, Terminal Block TB1

Page 14

InstallationLTPH-UM-1237-04

Table 2. Terminal Block (TB1)

Terminal

Description

 

 

1

-48V_A

 

 

2

-48V_B

 

 

3

BATTERY RETURN

 

 

4

FGND

 

 

1Remove the fuse(s) in the equipment bay fuse panel for the circuit(s) where the HRM-238 shelf battery wire(s) will terminate.

2Connect one end of the frame ground wire to Terminal 4 (FGND) on TB1 of the HRM-238 shelf and attach the other end of the frame ground wire to the CO ground wire termination point.

3Connect the -48 Vdc CO battery to the HRM-238 shelf (Figure 7):

a Connect a wire to the HRM-238 shelf TB1 Terminal 1 (-48V_A) for Primary CO battery. b Connect a wire to the HRM-238 shelf TB1 Terminal 2 (-48V_B) for Redundant CO battery.

cConnect the battery common wire to HRM-238 shelf TB1 Terminal 3 (BATTERY RETURN) of the HRM-238 shelf and attach the other end to CO battery ground source(s).

dConnect the wire(s) from the HRM-238 TB1 Terminal 1 and Terminal 2 to the CO -48 Vdc power termination point(s).

Terminal 2

Terminal 4 to

to -48 Vdc

frame ground (FGND)

 

 

H0547-B

 

 

 

Terminal 1

Terminal 3 to battery

to -48 Vdc

common (Battery Return)

Figure 7. Connect -48 Vdc and Frame Grounds to TB1

INSTALLING COMMUNICATION WIRING

All wiring and connections for the HRM-238 shelf are on the back. Figure 5 on page 4 shows the shelf backplane and connectors. Connect the NMA wiring from the HRM-238 shelf to each HiGain or Megabit Modem line unit that will be managed using the steps beginning on page 7. Then, use the other connectors in “Connect to a LAN or Interconnect Shelves” on page 9 and “Connect to a Computer, Terminal, or Modem” on page 9 that are appropriate for your application.

6

July 21, 2004

HRM-238 List 1

Image 14
Contents HRM-238 List 1 HiGain Retrofit Management Shelf Clei T1MFW004Revision History Using this Manual Inspecting ShipmentInspecting Shipment Table of Contents List of Figures OS Port P2 and P4 Alarm J13 and J14 Pinouts List of TablesList of Tables Features OverviewOperational Capabilities ApplicationRecommended Network Setup for 3190 Type Shelves Connector Purpose Type Gender No. Pins Management CablingInstalling Frame Ground and Battery Power InstallationInstalling the HRM-238 Shelf Inspecting Your ShipmentInstalling Communication Wiring Terminal Block TB1Connect NMA Wiring For 220 type mechanicsP1 and P6 NMA Connectors Connect to a LAN or Interconnect Shelves Connect to a Computer, Terminal, or ModemAUX P3 and P5 Connectors Insert Fuse Identifying AlarmsTurning UP the System Secure Cabling Installing the Management UnitsVerify Cabling Appendix a Specifications PhysicalAppendix B Product Support Appendix C Abbreviations Appendix C Abbreviations Certification and Warranty FCC ComplianceWorld Headquarters Technical Assistance