3Com 9400 manual Index, Numbers

Page 59

INDEX

Numbers

1000BASE GBIC ports 19 cabling 22

1000BASE-LX ports cabling 20

1000BASE-SX ports 19

cabling 21 10BASE-TX port 27 3Com

training 43

3Com bulletin board service (3Com BBS) 54 3Com URL 53

3Com Facts 54

A

Administration Console configuring IP addresses 36

air conditioning requirements for system 48

audience 7

B

baud setting 35 brackets, mounting 18 building codes

BOCA (Basic Building Code) 50

ICBO (International Conference of Building Officials) 50

SBC (Standard Building Code) 50 Uniform Building Code 50

bulletin board service 54

C

cabling

 

 

 

 

 

 

1000BASE GBIC ports

22

1000BASE-LX ports

22

1000BASE-SX ports

21

Console port

26

 

 

 

Gigabit Ethernet

20 to 25

modem

26

 

 

 

 

out-of-band management port 27

serial port

26

 

 

 

 

cabling system plans

49

 

cautions in text

 

 

 

 

defined

8

 

 

 

 

 

CD-ROM documentation

10

Console port

 

 

 

 

 

baud setting

35

 

 

 

cabling

26

 

 

 

 

 

default settings 35

 

 

IP network

33

 

 

 

modem

33

 

 

 

 

pin assignments

27

 

 

terminal

33

 

 

 

 

conventions in text

8

 

 

cooling the system

48

 

 

D

DB-9 connector pin assignments 26

diagnostic signs

37

 

distribution rack

 

 

preparing for system installation

18

requirements

48

 

documentation

 

 

comments 10

 

 

for the CoreBuilder 9400 system

9

documents on CD-ROM 10

 

E

EIA (electrical code)

 

 

standard equipment rack 49

 

standards 51

 

 

electrical codes

 

 

 

EIA (Electronics Industry Association)

51

NEC (National Electrical Code) 51

 

NEMA (National Electrical Manufacturing

Association)

51

 

Underwriters’ Laboratory (UL) Listing

51

environmental specifications

 

requirements

41, 48

 

Ethernet LEDs

30, 39

 

Ethernet Pckt LED

 

 

troubleshooting

39

 

Ethernet Stat LED

 

 

troubleshooting

39

 

F

fan tray

 

 

 

removal and replacement

45

Fault LED

30

 

 

troubleshooting 38

 

 

fault tolerance 12

 

 

fax service (3Com Facts) 54

 

feedback on documentation

10

fiber optic cables

 

 

cleaning

40

 

 

fiber optic port safety

19

 

field replaceable units

43

 

floor plan

47

 

 

Image 59
Contents CoreBuilder Japan Vcci Class a Compliance United States Government LegendsAustralian EMC Frameworks Compliance Page Contents System Specifications For information on IntroductionFinding Specific Information in This Guide Convention Description ConventionsFor information on Turn to Icon Type DescriptionPaper Documents CoreBuilder 9400 DocumentationSoftware and Documents on CD-ROM Documentation CommentsYear 2000 Compliance System Features and Benefits CoreBuilder 9400 Intelligent SwitchSystem Management Network Configuration ExampleSpeeding Up Server Access 10BASE-TX System Overview Front PanelBack Panel of the CoreBuilder 9400 System System Overview Back PanelSystem Overview Sample Application SuperStackII SwitchSystem and Setup Overview Qty To use Installing the System on a Table TopBefore You Begin Installing System Mounting Brackets Installing the System in a Distribution RackOverview of Cabling Fiber Safety PrecautionsGuidelines for Gigabit Ethernet Cabling Cabling Gigabit Ethernet PortsCabling Gigabit Ethernet Ports Cabling 1000BASE-SX PortsCabling 1000BASE Gbic Ports System is powered on and runningSC connector cover Connecting the LX Transceiver to MMF When you cable Gbic transceivers, note that the SC Cabling the Console Port Console Port Pin Assignments Pin No Signal DescriptionCabling the Out-of-Band Management Port Male RJ-45 connector 10BASE-T cable Power Up System Power UPGigabit Ethernet Port Diagnostics Power-up DiagnosticsSystem Diagnostics System Next Step Software ConfigurationSystem Checks Check DescriptionSystem Power UP About CoreBuilder 9400 System Management Access Allows you to Using MechanismIP Management Interface Terminal ConnectionModem Connection Changing the Console Port Baud Setting Initial Management AccessOut-of-band Management Configuring the IP InterfaceIn-band Management Abnormal LED Activity Diagnosing ProblemsPower Failures Getting Additional HelpSymptom Possible Sources of the Problem Steps to Take LED Status Possible Sources of the Problem Steps to Take Diagnosing ProblemsCleaning Dirty Fiber Optic Ports and Connectors Environmental Requirements Specifications Physical DimensionsSafety Agency Certifications Power SupplyMIB II RFC Software Tftp RFC InstallationStandard Type RFC/IEEE Supported Snmp protocol RFCAudience Safety PrecautionsPower Supply Assembly Removal and Replacement Removing and Replacing the Power SupplyRemoving and Replacing the Power Supplies Fan Tray Assembly Removal and Replacement Fan Tray Assembly Removal and ReplacementAppendix B FIELD-REPLACEABLE Units Wiring Closet Recommendations General Safety RequirementsSpace Requirements for the Rack Distribution Rack RequirementsProtective Grounding for the Rack Mechanical Requirements for the Rack Recommended Service AccessBuilding Codes Building and Electrical CodesElectrical Codes NfpaAppendix C Site Requirements and Safety Codes World Wide Web Site Online Technical Services3Com Knowledgebase Web Services Country Data Rate Telephone Number 3Com Bulletin Board Service3Com Facts Automated Fax Service 3Com FTP SiteSupport from 3Com Support from Your Network SupplierLatin America Country Telephone Number Asia Pacific RimCountry EuropeCountry Telephone Number Fax Number Returning Products for RepairAppendix D Technical Support Numbers IndexIndex Recommendations World Wide Web WWW 50, 51 Index CoreBuilder 9400 High-Availability Switch 3Com Corporation Limited WarrantyWarranties Exclusive